SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
ยฉ 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsTexasAustin
TX-750673

PROGRESS@TECHR BUILDING 4

12200 Jourdan Crossing Blvd, Austin, TX, 78753

PROGRESS@TECHR BUILDING 4 is an EV charging location in Austin, TX with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
๐ŸŒImported from open data
๐Ÿ“…Open since 2025
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
โ€”

Stations & ports

1 station ยท 2 ports
PROGRESS@TECHR BUILDING 4 ยท L2 J1772 6.5 kW
ChargePoint Network
AC L2 ยท 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network โ†’
1AJ1772ยท 6.5 kW
1BJ1772ยท 6.5 kW

Estimated charging time

Level 2 (AC) ยท 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV โ†’

12200 Jourdan Crossing Blvd ยท Austin, TX ยท 78753

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet โ€” be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is PROGRESS@TECHR BUILDING 4 located?
PROGRESS@TECHR BUILDING 4 is located at 12200 Jourdan Crossing Blvd, Austin, TX.
What kind of charging does PROGRESS@TECHR BUILDING 4 offer?
PROGRESS@TECHR BUILDING 4 offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at PROGRESS@TECHR BUILDING 4?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at PROGRESS@TECHR BUILDING 4. Actual times vary with vehicle, temperature, and station load.
What are PROGRESS@TECHR BUILDING 4's charging hours?
24 hours daily
What charging network operates PROGRESS@TECHR BUILDING 4?
PROGRESS@TECHR BUILDING 4 is part of the ChargePoint network. See more ChargePoint charging across TX on SpotCharge.
Can anyone use the chargers at PROGRESS@TECHR BUILDING 4?
Yes โ€” PROGRESS@TECHR BUILDING 4 is a publicly accessible charging location.
Is the PROGRESS@TECHR BUILDING 4 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Texas ยท 2024
Plug-in vehicles
359K
#3 in US
Battery-electric
295K
82% of fleet
EVs per public port
26
13,836 ports listed

As of 2024, Texas had 359,400 plug-in vehicles registered โ€” 294,700 fully battery-electric (82%) and 64,700 plug-in hybrid (18%). That ranks Texas #3 nationally and represents about 6.0% of all US plug-in registrations.

Across 13,836 publicly-listed ports in Texas (6,396 Level 2 and 7,430 DC fast), that works out to roughly 26 EVs per public port and 39.7 BEVs per DC fast port.

Texas's public charging is keeping pace with adoption โ€” but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) ยท See full Texas market data โ†’

More charging in Austin

See all โ†’

Austin, TX Rechargery Relay - S I-35 Frontage Rd

Austin, TX

DC FastIONNA
2 stations ยท 4 ports400 kW

ASHTON AUSTIN STATION3

Austin, TX

Level 2ChargePoint
1 station ยท 2 ports6.5 kW

St. Davids North Austin Medical Center

Austin, TX

Level 2Blink
2 stations ยท 20 ports19.2 kW

ALPHA CHURCH EV CHARGER

Austin, TX

Level 2ChargePoint
1 station ยท 2 ports19.2 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide โ€” trip-planning pages covering the best charging across the area.

Austin โ†’All Texas destinations โ†’
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint โ†—
Access
Public access

Verified by NREL ยท 6 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fieldsโ–พ

From U.S. DOE AFDC ยท Public domain

id417680
zip78753
cityAustin
plus4โ€”
stateTX
ng_psiโ€”
cng_psiโ€”
countryUS
latitude30.384675
bd_blendsโ€”
longitude-97.653666
open_date2025-08-08
rd_blendsโ€”
ev_networkChargePoint Network
ev_pricingโ€”
updated_at2026-09-14T02:58:55Z
access_codepublic
cng_has_rngโ€”
lng_has_rngโ€”
lpg_primaryโ€”
status_codeE
bd_blends_frโ€”
hy_is_retailโ€”
hy_pressuresโ€”
hy_standardsโ€”
rd_blends_frโ€”
station_namePROGRESS@TECHR BUILDING 4
ev_other_evseโ€”
ev_pricing_frโ€”
expected_dateโ€”
facility_typeโ€”
nps_unit_nameโ€”
station_phone888-758-4389
cards_acceptedโ€”
ev_dc_fast_numโ€”
ev_network_ids
{
  "posts": [
    "27680111",
    "27680121"
  ],
  "station": [
    "USCPIL17702191"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_linkโ€”
street_address12200 Jourdan Crossing Blvd
funding_sourcesโ€”
owner_type_codeโ€”
access_days_time24 hours daily
e85_blender_pumpโ€”
lpg_nozzle_typesโ€”
ng_vehicle_classโ€”
related_stationsโ€”
cng_dispenser_numโ€”
cng_total_storageโ€”
cng_vehicle_classโ€”
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_classโ€”
ng_fill_type_codeโ€”
restricted_accessNo
access_detail_codeโ€”
cng_fill_type_codeโ€”
ev_connector_typesJ1772
ev_level1_evse_numโ€”
ev_level2_evse_num2
access_days_time_frโ€”
date_last_confirmed2026-09-14
ev_renewable_sourceโ€”
cng_renewable_sourceโ€”
lng_renewable_sourceโ€”
cng_total_compressionโ€”
ev_workplace_chargingNo
maximum_vehicle_classโ€”
rd_max_biodiesel_levelโ€”
groups_with_access_codePublic
intersection_directionsโ€”
e85_other_ethanol_blendsโ€”
rd_blended_with_biodieselโ€”
groups_with_access_code_frPublic
intersection_directions_frโ€”
SpotCharge ยท Owner-listed EV charging