SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsTexasAustin
TX-238380

JW Marriott Austin - Tesla Destination

110 East 2nd Street, Austin, TX, 78701

JW Marriott Austin - Tesla Destination is a hotel in Austin, TX with 2 Level 2 charging ports up to 10 kW on the Tesla Destination network. Charging is free. 24 hours daily. Open to Teslas only. Public access. Listing data from NREL, last confirmed August 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏨Hotel→
📅Open since 2022
Max power
10 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily. Open to Teslas only.
Pricing
Free
Free

Stations & ports

1 station · 2 ports
JW Marriott Austin - Tesla Destination · L2 Tesla 10 kW
Tesla Destination
AC L2 · 10 kW

10 kW adds roughly 35 miles of range per hour for a typical EV.

Start session on Tesla Destination network →
1ATesla· 10 kW
1BTesla· 10 kW

Estimated charging time

Level 2 (AC) · 10 kW
~5 h 50 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

110 East 2nd Street · Austin, TX · 78701

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is JW Marriott Austin - Tesla Destination located?
JW Marriott Austin - Tesla Destination is located at 110 East 2nd Street, Austin, TX.
What kind of charging does JW Marriott Austin - Tesla Destination offer?
JW Marriott Austin - Tesla Destination offers Level 2 (AC) charging, with stations rated up to 10 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at JW Marriott Austin - Tesla Destination?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 50 min on 10 kW Level 2 (AC) charging at JW Marriott Austin - Tesla Destination. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at JW Marriott Austin - Tesla Destination?
Free
What are JW Marriott Austin - Tesla Destination's charging hours?
24 hours daily. Open to Teslas only.
What charging network operates JW Marriott Austin - Tesla Destination?
JW Marriott Austin - Tesla Destination is part of the Tesla Destination network. See more Tesla Destination charging across TX on SpotCharge.
Can anyone use the chargers at JW Marriott Austin - Tesla Destination?
Yes — JW Marriott Austin - Tesla Destination is a publicly accessible charging location.
Is the JW Marriott Austin - Tesla Destination listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Texas · 2024
Plug-in vehicles
359K
#3 in US
Battery-electric
295K
82% of fleet
EVs per public port
26
13,830 ports listed

As of 2024, Texas had 359,400 plug-in vehicles registered — 294,700 fully battery-electric (82%) and 64,700 plug-in hybrid (18%). That ranks Texas #3 nationally and represents about 6.0% of all US plug-in registrations.

Across 13,830 publicly-listed ports in Texas (6,396 Level 2 and 7,424 DC fast), that works out to roughly 26 EVs per public port and 39.7 BEVs per DC fast port.

Texas's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Texas market data →

More charging in Austin

See all →

Austin, TX Rechargery Relay - S I-35 Frontage Rd

Austin, TX

DC FastIONNA
2 stations · 4 ports400 kW

ASHTON AUSTIN STATION3

Austin, TX

Level 2ChargePoint
1 station · 2 ports6.5 kW

St. Davids North Austin Medical Center

Austin, TX

Level 2Blink
2 stations · 20 ports19.2 kW

ALPHA CHURCH EV CHARGER

Austin, TX

Level 2ChargePoint
1 station · 2 ports19.2 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Austin →All Texas destinations →
Details
Hours
24 hours daily. Open to Teslas only.
Pricing
Free
Phone
877-798-3752
Network
Tesla Destination ↗
Access
Public access
Ownership
Privately owned
From NREL

Verified by NREL · 3 weeks ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id250923
zip78701
cityAustin
plus4—
stateTX
ng_psi—
cng_psi—
countryUS
latitude30.2645053
bd_blends—
longitude-97.7433019
open_date2022-03-25
rd_blends—
ev_networkTesla Destination
ev_pricingFree
updated_at2026-08-27T18:11:53Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameJW Marriott Austin - Tesla Destination
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone877-798-3752
cards_accepted—
ev_dc_fast_num—
ev_network_webhttps://www.tesla.com/destination-charging
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address110 East 2nd Street
funding_sources—
owner_type_codeP
access_days_time24 hours daily. Open to Teslas only.
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Tesla Destination",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 10,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Tesla Destination",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": 10,
        "port_count": 1
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesTESLA
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-08-27
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging