SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsNew JerseyEdison
NJ-931557

EPA Edison

Woodbridge Ave, Edison, NJ, 08837

EPA Edison is a fed gov in Edison, NJ with 4 Level 2 charging ports, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. By appointment. Listing data from NREL, last confirmed December 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
Max power
—
AC Level 2
Ports
4
ports
Hours
—
Pricing
—

Stations & ports

1 station · 4 ports
EPA Edison · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772
1BJ1772
1CJ1772
1DJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

Woodbridge Ave · Edison, NJ · 08837

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is EPA Edison located?
EPA Edison is located at Woodbridge Ave, Edison, NJ.
What kind of charging does EPA Edison offer?
EPA Edison offers Level 2 (AC) charging. There is 1 charging station and 4 total ports at this location.
How long does it take to charge an EV at EPA Edison?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at EPA Edison. Actual times vary with vehicle, temperature, and station load.
Can anyone use the chargers at EPA Edison?
EPA Edison is listed as by appointment access — check the details before visiting.
Is the EPA Edison listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

New Jersey · 2024
Plug-in vehicles
225K
#6 in US
Battery-electric
174K
77% of fleet
EVs per public port
30.7
7,352 ports listed

As of 2024, New Jersey had 225,400 plug-in vehicles registered — 173,800 fully battery-electric (77%) and 51,600 plug-in hybrid (23%). That ranks New Jersey #6 nationally and represents about 3.7% of all US plug-in registrations.

Across 7,352 publicly-listed ports in New Jersey (3,999 Level 2 and 3,347 DC fast), that works out to roughly 30.7 EVs per public port and 51.9 BEVs per DC fast port.

New Jersey's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full New Jersey market data →

More charging in Edison

See all →

CSIEMPLOYEES RIGHT

Edison, NJ

Level 2ChargePoint
1 station · 1 port11.5 kW

CSIEMPLOYEES LEFT

Edison, NJ

Level 2ChargePoint
1 station · 1 port11.5 kW

EV STATION # JCC EV STATIONS

Edison, NJ

Level 2ChargePoint
1 station · 1 port7.7 kW

KILMER NJ SDC

Edison, NJ

Level 2
1 station · 150 ports
Details
Network
Non-networked
Access
By appointment

Last updated · 9 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging