SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMinnesotaRochester
MN-252831

ROCHESTER - MPO and Pkg Garage

1445 Valleyhigh Dr NW, Rochester, MN, 55901
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
Max power
7.2 kW
AC Level 2
Ports
18
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 18 ports
ROCHESTER - MPO and Pkg Garage · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
1GJ1772· 7.2 kW· 240V/30A
1HJ1772· 7.2 kW· 240V/30A
1IJ1772· 7.2 kW· 240V/30A
1JJ1772· 7.2 kW· 240V/30A
1KJ1772· 7.2 kW· 240V/30A
1LJ1772· 7.2 kW· 240V/30A
1MJ1772· 7.2 kW· 240V/30A
1NJ1772· 7.2 kW· 240V/30A
1OJ1772· 7.2 kW· 240V/30A
1PJ1772· 7.2 kW· 240V/30A
1QJ1772· 7.2 kW· 240V/30A
1RJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1445 Valleyhigh Dr NW · Rochester, MN · 55901

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is ROCHESTER - MPO and Pkg Garage located?
ROCHESTER - MPO and Pkg Garage is located at 1445 Valleyhigh Dr NW, Rochester, MN.
What kind of charging does ROCHESTER - MPO and Pkg Garage offer?
ROCHESTER - MPO and Pkg Garage offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 18 total ports at this location.
How long does it take to charge an EV at ROCHESTER - MPO and Pkg Garage?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at ROCHESTER - MPO and Pkg Garage. Actual times vary with vehicle, temperature, and station load.
What are ROCHESTER - MPO and Pkg Garage's charging hours?
Open 24 hours
What charging network operates ROCHESTER - MPO and Pkg Garage?
ROCHESTER - MPO and Pkg Garage is part of the Non-Networked network. See more Non-Networked charging across MN on SpotCharge.
Can anyone use the chargers at ROCHESTER - MPO and Pkg Garage?
ROCHESTER - MPO and Pkg Garage is listed as by appointment access — check the details before visiting.
Is the ROCHESTER - MPO and Pkg Garage listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Minnesota · 2024
Plug-in vehicles
68K
#21 in US
Battery-electric
47K
70% of fleet
EVs per public port
22.2
3,046 ports listed

As of 2024, Minnesota had 67,500 plug-in vehicles registered — 47,400 fully battery-electric (70%) and 20,100 plug-in hybrid (30%). That ranks Minnesota #21 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,046 publicly-listed ports in Minnesota (1,770 Level 2 and 1,265 DC fast), that works out to roughly 22.2 EVs per public port and 37.5 BEVs per DC fast port.

Minnesota's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Minnesota market data →

More charging in Rochester

See all →

The Berkman

Rochester, MN

DC FastLevel 2US_SUPERCHARGE
2 stations · 4 ports50 kW

Hy-Vee - Tesla Supercharger

Rochester, MN

DC FastTesla
1 station · 8 ports50 kW

Tom Kadlec Kia - DCFC

Rochester, MN

DC FastBlink Network
1 station · 2 ports50 kW

PARKING GOVCENT_3

Rochester, MN

Level 2ChargePoint Network
1 station · 1 port7.2 kW
Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Last updated · 6 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging