SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMinnesotaRochester
MN-419887

OSM Charger #n12963660631

4800 US-52, Rochester, MN, 55901

OSM Charger #n12963660631 is an EV charging location in Rochester, MN with 4 DC fast charging ports up to 200 kW on the ChargePoint network. 24/7. Public access. Listing data from OpenStreetMap, last confirmed June 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
200 kW
DC fast
Ports
4
ports
Hours
24/7
24/7
Pricing
—

Stations & ports

2 stations · 4 ports
OSM Charger #n12963660631 · CCS
ChargePoint
DC fast · 200 kW

200 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

1ACCS· 200 kW· 480V/100A
1BCCS· 200 kW· 480V/100A
1CCCS· 200 kW· 480V/100A
OSM Charger #n12963660631 · CHAdeMO
ChargePoint
DC fast · 62 kW

62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

2ACHAdeMO· 62 kW· 480V/100A

Estimated charging time

DC fast charging · 200 kW
~18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

4800 US-52 · Rochester, MN · 55901

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is OSM Charger #n12963660631 located?
OSM Charger #n12963660631 is located at 4800 US-52, Rochester, MN.
What kind of charging does OSM Charger #n12963660631 offer?
OSM Charger #n12963660631 offers DC fast charging, with stations rated up to 200 kW. There are 2 charging stations and 4 total ports at this location.
How long does it take to charge an EV at OSM Charger #n12963660631?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 18 min on 200 kW DC fast charging at OSM Charger #n12963660631. Actual times vary with vehicle, temperature, and station load.
What are OSM Charger #n12963660631's charging hours?
24/7
What charging network operates OSM Charger #n12963660631?
OSM Charger #n12963660631 is part of the ChargePoint network. See more ChargePoint charging across MN on SpotCharge.
Can anyone use the chargers at OSM Charger #n12963660631?
Yes — OSM Charger #n12963660631 is a publicly accessible charging location.
Is the OSM Charger #n12963660631 listing owner-managed?
Not yet. This page was generated from open charging data (OpenStreetMap) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Minnesota · 2024
Plug-in vehicles
68K
#21 in US
Battery-electric
47K
70% of fleet
EVs per public port
19.7
3,428 ports listed

As of 2024, Minnesota had 67,500 plug-in vehicles registered — 47,400 fully battery-electric (70%) and 20,100 plug-in hybrid (30%). That ranks Minnesota #21 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,428 publicly-listed ports in Minnesota (1,970 Level 2 and 1,447 DC fast), that works out to roughly 19.7 EVs per public port and 32.8 BEVs per DC fast port.

Minnesota has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Minnesota drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Minnesota market data →

More DC fast charging

DC fast charging in Rochester →DC fast charging in Minnesota →ChargePoint in Minnesota →

More charging in Rochester

See all →

RPU RPU_1

Rochester, MN

Level 2ChargePoint
1 station · 2 ports15.4 kW

Rochester Ford

Rochester, MN

DC FastBlink
1 station · 4 ports300 kW

ChargePoint

Rochester, MN

Level 2ChargePoint
1 station · 2 ports

The Berkman

Rochester, MN

DC FastLevel 2US Supercharge
2 stations · 4 ports240 kW
Details
Hours
24/7
Network
ChargePoint
Access
Public access

Synced from OpenStreetMap · 3 months ago

Data from OpenStreetMap (ODbL)

SpotCharge · Owner-listed EV charging