SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganBoyne City
MI-898618

Great Lakes Energy - Boyne City Office

1323 Boyne Avenue, Boyne City, MI, 49712

Great Lakes Energy - Boyne City Office is an EV charging location in Boyne City, MI with 2 Level 2 charging ports up to 15 kW on the OpConnect network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2023
Max power
15.4 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 2 ports
Great Lakes Energy - Boyne City Office · L2 J1772 15.4 kW
OpConnect
AC L2 · 15.4 kW

15.4 kW adds roughly 55 miles of range per hour for a typical EV.

Start session on OpConnect network →
1AJ1772· 15.4 kW
1BJ1772· 15.4 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1323 Boyne Avenue · Boyne City, MI · 49712

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Great Lakes Energy - Boyne City Office located?
Great Lakes Energy - Boyne City Office is located at 1323 Boyne Avenue, Boyne City, MI.
What kind of charging does Great Lakes Energy - Boyne City Office offer?
Great Lakes Energy - Boyne City Office offers Level 2 (AC) charging, with stations rated up to 15.4 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Great Lakes Energy - Boyne City Office?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at Great Lakes Energy - Boyne City Office. Actual times vary with vehicle, temperature, and station load.
What are Great Lakes Energy - Boyne City Office's charging hours?
24 hours daily
What charging network operates Great Lakes Energy - Boyne City Office?
Great Lakes Energy - Boyne City Office is part of the OpConnect network. See more OpConnect charging across MI on SpotCharge.
Can anyone use the chargers at Great Lakes Energy - Boyne City Office?
Yes — Great Lakes Energy - Boyne City Office is a publicly accessible charging location.
Is the Great Lakes Energy - Boyne City Office listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
18.5
5,922 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 5,922 publicly-listed ports in Michigan (3,454 Level 2 and 2,445 DC fast), that works out to roughly 18.5 EVs per public port and 31 BEVs per DC fast port.

Michigan has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Michigan drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More charging in Boyne City

See all →

District Library Boyne City MI

Boyne City, MI

Level 2Red E Charge
1 station · 2 ports12 kW

River St Boyne City MI

Boyne City, MI

Level 2Red E Charge
1 station · 2 ports9.6 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Little Traverse Bay →All Michigan destinations →
Details
Hours
24 hours daily
Phone
855-885-9571
Network
OpConnect ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id303184
zip49712
cityBoyne City
plus4—
stateMI
ng_psi—
cng_psi—
countryUS
latitude45.20589
bd_blends—
longitude-84.98861
open_date2023-07-25
rd_blends—
ev_networkOpConnect
ev_pricing—
updated_at2026-09-18T03:54:30Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameGreat Lakes Energy - Boyne City Office
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone855-885-9571
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "1844_1",
    "1845_1"
  ],
  "station": [
    "498"
  ]
}
ev_network_webhttps://opconnect-ev.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1323 Boyne Avenue
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "OpConnect",
    "connectors": {
      "J1772": {
        "power_kw": 15.4,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "OpConnect",
    "connectors": {
      "J1772": {
        "power_kw": 15.4,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging