The Beauton Apartments
Detroit, MI
For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.
Across 5,352 publicly-listed ports in Michigan (3,101 Level 2 and 2,228 DC fast), that works out to roughly 20.4 EVs per public port and 34 BEVs per DC fast port.
Michigan's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.
Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →
Detroit, MI
Detroit, MI
Detroit, MI
Detroit, MI
This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From U.S. DOE AFDC · Public domain
| id | 439500 |
|---|---|
| zip | 48221 |
| city | Detroit |
| plus4 | — |
| state | MI |
| ng_psi | — |
| cng_psi | — |
| country | US |
| latitude | 42.43496 |
| bd_blends | — |
| longitude | -83.14137 |
| open_date | 2025-10-31 |
| rd_blends | — |
| ev_network | RED_E |
| ev_pricing | — |
| updated_at | 2026-06-12T06:35:59Z |
| access_code | public |
| cng_has_rng | — |
| lng_has_rng | — |
| lpg_primary | — |
| status_code | E |
| bd_blends_fr | — |
| hy_is_retail | — |
| hy_pressures | — |
| hy_standards | — |
| rd_blends_fr | — |
| station_name | Livernois EV Lot |
| ev_other_evse | — |
| ev_pricing_fr | — |
| expected_date | — |
| facility_type | PUBLIC |
| nps_unit_name | — |
| station_phone | 313-262-6722 |
| cards_accepted | — |
| ev_dc_fast_num | 4 |
| ev_network_ids | {
"posts": [
"4487*1",
"4487*2",
"4487*3",
"4487*4"
],
"station": [
"1425"
]
} |
| ev_network_web | https://www.redecharge.com |
| fuel_type_code | ELEC |
| geocode_status | GPS |
| hy_status_link | — |
| street_address | 19384 Livernois Ave |
| funding_sources | — |
| owner_type_code | — |
| access_days_time | — |
| e85_blender_pump | — |
| lpg_nozzle_types | — |
| ng_vehicle_class | — |
| related_stations | — |
| cng_dispenser_num | — |
| cng_total_storage | — |
| cng_vehicle_class | — |
| ev_charging_units | [
{
"network": "RED_E",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 240,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
},
{
"network": "RED_E",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 240,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
},
{
"network": "RED_E",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 240,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
},
{
"network": "RED_E",
"connectors": {
"J1772": {
"power_kw": null,
"port_count": 0
},
"J3271": {
"power_kw": null,
"port_count": 0
},
"TESLA": {
"power_kw": null,
"port_count": 0
},
"CHADEMO": {
"power_kw": null,
"port_count": 0
},
"NEMA515": {
"power_kw": null,
"port_count": 0
},
"NEMA520": {
"power_kw": null,
"port_count": 0
},
"NEMA1450": {
"power_kw": null,
"port_count": 0
},
"J1772COMBO": {
"power_kw": 240,
"port_count": 1
}
},
"port_count": 1,
"charging_level": "dc_fast",
"funding_sources": []
}
] |
| lng_vehicle_class | — |
| ng_fill_type_code | — |
| restricted_access | No |
| access_detail_code | — |
| cng_fill_type_code | — |
| ev_connector_types | J1772COMBO |
| ev_level1_evse_num | — |
| ev_level2_evse_num | — |
| access_days_time_fr | — |
| date_last_confirmed | 2026-06-12 |
| ev_renewable_source | — |
| cng_renewable_source | — |
| lng_renewable_source | — |
| cng_total_compression | — |
| ev_workplace_charging | No |
| maximum_vehicle_class | — |
| rd_max_biodiesel_level | — |
| groups_with_access_code | Public |
| intersection_directions | — |
| e85_other_ethanol_blends | — |
| rd_blended_with_biodiesel | — |
| groups_with_access_code_fr | Public |
| intersection_directions_fr | — |
From OpenChargeMap · CC-BY-SA 4.0
| ID | 467809 |
|---|---|
| UUID | 9EC895D9-0BAF-4997-A079-D57F1FF922CF |
| UsageCost | $0.38/kWh |
| MediaItems | [
{
"ID": 52155,
"User": {
"ID": 44742,
"Username": "MidwestEVAdventures"
},
"Comment": "",
"IsVideo": false,
"ItemURL": "https://s3-ap-southeast-2.amazonaws.com/openchargemap/images/US/OCM467809/OCM-467809.orig.2025112301124807.jpg",
"IsEnabled": true,
"DateCreated": "2025-11-23T01:13:00Z",
"ChargePointID": 467809,
"IsFeaturedItem": false,
"ItemThumbnailURL": "https://s3-ap-southeast-2.amazonaws.com/openchargemap/images/US/OCM467809/OCM-467809.thmb.2025112301124807.jpg",
"IsExternalResource": false
}
] |
| OperatorID | 3696 |
| AddressInfo | {
"ID": 468198,
"Town": "Detroit",
"Title": "Livernois EV Lot",
"Latitude": 42.43496,
"Postcode": "48221",
"CountryID": 2,
"Longitude": -83.14137,
"RelatedURL": "https://www.redecharge.com",
"AddressLine1": "19384 Livernois Ave",
"DistanceUnit": 0,
"AccessComments": "",
"StateOrProvince": "MI",
"ContactTelephone1": "313-262-6722"
} |
| Connections | [
{
"ID": 785883,
"Amps": 300,
"LevelID": 3,
"PowerKW": 240,
"Voltage": 950,
"Comments": "",
"Quantity": 2,
"StatusTypeID": 50,
"CurrentTypeID": 30,
"ConnectionTypeID": 32
}
] |
| DateCreated | 2025-11-11T13:45:00Z |
| UsageTypeID | 1 |
| OperatorInfo | {
"ID": 3696,
"Title": "Red E Charge",
"Comments": null,
"BookingURL": null,
"WebsiteURL": "https://www.redecharge.com/",
"AddressInfo": null,
"ContactEmail": null,
"FaultReportEmail": null,
"IsRestrictedEdit": false,
"IsPrivateIndividual": false,
"PhonePrimaryContact": null,
"PhoneSecondaryContact": null
} |
| StatusTypeID | 50 |
| DataProviderID | 1 |
| NumberOfPoints | 2 |
| DateLastVerified | 2025-11-23T01:13:00Z |
| DateLastStatusUpdate | 2025-11-23T01:13:00Z |
| SubmissionStatusTypeID | 100 |