SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMichiganDetroit
MI-016471

MCorp M22 Detroit BP

714 E Warren Ave, Detroit, MI, 48201

MCorp M22 Detroit BP is a public in Detroit, MI with 4 DC fast charging ports up to 320 kW on the Red E Charge network. Public access. Listing data from NREL, last confirmed November 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
📅Open since 2026
Max power
320.2 kW
DC fast
Ports
4
ports
Hours
—
Pricing
—

Stations & ports

1 station · 4 ports
MCorp M22 Detroit BP · DCFC CCS 320.2 kW
RED_E
DC fast · 320.2 kW

320.2 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on RED_E network →
1ACCS· 320.2 kW
1BCCS· 320.2 kW
1CCCS· 320.2 kW
1DCCS· 320.2 kW

Estimated charging time

DC fast charging · 320.2 kW
~11 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

714 E Warren Ave · Detroit, MI · 48201

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is MCorp M22 Detroit BP located?
MCorp M22 Detroit BP is located at 714 E Warren Ave, Detroit, MI.
What kind of charging does MCorp M22 Detroit BP offer?
MCorp M22 Detroit BP offers DC fast charging, with stations rated up to 320.2 kW. There is 1 charging station and 4 total ports at this location.
How long does it take to charge an EV at MCorp M22 Detroit BP?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 11 min on 320.2 kW DC fast charging at MCorp M22 Detroit BP. Actual times vary with vehicle, temperature, and station load.
What charging network operates MCorp M22 Detroit BP?
MCorp M22 Detroit BP is part of the Red E Charge network. See more Red E Charge charging across MI on SpotCharge.
Can anyone use the chargers at MCorp M22 Detroit BP?
Yes — MCorp M22 Detroit BP is a publicly accessible charging location.
Is the MCorp M22 Detroit BP listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Michigan · 2024
Plug-in vehicles
109K
#17 in US
Battery-electric
76K
69% of fleet
EVs per public port
17.7
6,168 ports listed

As of 2024, Michigan had 109,400 plug-in vehicles registered — 75,800 fully battery-electric (69%) and 33,600 plug-in hybrid (31%). That ranks Michigan #17 nationally and represents about 1.8% of all US plug-in registrations.

Across 6,168 publicly-listed ports in Michigan (3,541 Level 2 and 2,604 DC fast), that works out to roughly 17.7 EVs per public port and 29.1 BEVs per DC fast port.

Michigan has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Michigan drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Michigan market data →

More DC fast charging

DC fast charging in Detroit →DC fast charging in Michigan →Red E Charge in Michigan →

More charging in Detroit

See all →

ROYAL FRESH ROYAL FRESH PL2

Detroit, MI

DC FastChargePoint
1 station · 2 ports320 kW

Royal Fresh

Detroit, MI

DC FastChargePoint
1 station · 4 ports320 kW

BP - MCorp

Detroit, MI

DC FastRed E Charge
1 station · 4 ports320 kW

Hunt Street Station

Detroit, MI

Level 2Red E Charge
1 station · 4 ports9.6 kW

Plan a trip around here

This charger is part of a SpotCharge destination guide — trip-planning pages covering the best charging across the area.

Metro Detroit →All Michigan destinations →
Details
Phone
313-262-6722
Network
Red E Charge ↗
Access
Public access

Verified by NREL · 1 day ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center76 fields▾

From U.S. DOE AFDC · Public domain

id471955
zip48201
cityDetroit
plus4—
stateMI
ng_psi—
cng_psi—
countryUS
latitude42.36041
bd_blends—
longitude-83.0549
open_date2026-10-25
rd_blends—
ev_networkRED_E
ev_pricing—
unverifiedNo
updated_at2026-11-03T05:36:04Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMCorp M22 Detroit BP
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typePUBLIC
nps_unit_name—
station_phone313-262-6722
cards_accepted—
ev_dc_fast_num4
ev_network_ids
{
  "posts": [
    "8199*1",
    "8199*2",
    "8493*1",
    "8493*2"
  ],
  "station": [
    "2106"
  ]
}
ev_network_webhttps://www.redecharge.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address714 E Warren Ave
funding_sources—
owner_type_code—
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 320.2,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 320.2,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 320.2,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "RED_E",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 320.2,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-11-03
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging