SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMaineBar Harbor
ME-242809

Acadia National Park Headquarters

20 McFarland Dr, Bar Harbor, ME, 04609

Acadia National Park Headquarters is a natl park in Bar Harbor, ME with 2 Level 2 charging ports up to 12 kW, not on a charging network. Pricing: $2 donation to begin charging. By appointment. Listing data from NREL, last confirmed June 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Natl park
📅Open since 2020
🚚Fits Light-duty (cars, SUVs)
Max power
11.5 kW
AC Level 2
Ports
2
ports
Hours
—
Pricing
$2 donation to begin c…
$2 donation to begin charging

Stations & ports

1 station · 2 ports
Acadia National Park Headquarters · L2 J1772 11.5 kW
Non-Networked
AC L2 · 11.5 kW

11.5 kW adds roughly 40 miles of range per hour for a typical EV.

1AJ1772· 11.5 kW
1BJ1772· 11.5 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

20 McFarland Dr · Bar Harbor, ME · 04609

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Acadia National Park Headquarters located?
Acadia National Park Headquarters is located at 20 McFarland Dr, Bar Harbor, ME.
What kind of charging does Acadia National Park Headquarters offer?
Acadia National Park Headquarters offers Level 2 (AC) charging, with stations rated up to 11.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Acadia National Park Headquarters?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at Acadia National Park Headquarters. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Acadia National Park Headquarters?
$2 donation to begin charging
Can anyone use the chargers at Acadia National Park Headquarters?
Acadia National Park Headquarters is listed as by appointment access — check the details before visiting.
Is the Acadia National Park Headquarters listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Maine · 2024
Plug-in vehicles
19K
#35 in US
Battery-electric
9.7K
51% of fleet
EVs per public port
9.2
2,065 ports listed

As of 2024, Maine had 18,900 plug-in vehicles registered — 9,700 fully battery-electric (51%) and 9,200 plug-in hybrid (49%). That ranks Maine #35 nationally and represents about 0.3% of all US plug-in registrations.

Across 2,065 publicly-listed ports in Maine (1,257 Level 2 and 808 DC fast), that works out to roughly 9.2 EVs per public port and 12 BEVs per DC fast port.

Maine has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Maine drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Maine market data →

More charging in Bar Harbor

See all →

NERO: ACAD - 3

Bar Harbor, ME

Level 2
1 station · 2 ports

Town of Bar Harbor - Park Street

Bar Harbor, ME

Level 2AmpUp
1 station · 4 ports

Indian Point - Blagden Preserve

Bar Harbor, ME

Level 2Rivian Waypoints
1 station · 2 ports11 kW

Steamboat Landing - Tesla Destination

Bar Harbor, ME

Level 2Tesla Destination
2 stations · 6 ports10 kW
Details
Pricing
$2 donation to begin charging
Network
Non-networked
Access
By appointment
Ownership
Privately owned
From NREL

Verified by NREL · 16 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id166753
zip04609
cityBar Harbor
plus4—
stateME
ng_psi—
cng_psi—
countryUS
latitude44.374278
bd_blends—
longitude-68.259062
open_date2020-08-31
rd_blends—
ev_networkNon-Networked
ev_pricing$2 donation to begin charging
updated_at2026-02-02T23:16:24Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameAcadia National Park Headquarters
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeNATL_PARK
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_web—
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address20 McFarland Dr
funding_sources—
owner_type_codeP
access_days_timeAdministrative use only
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": 11.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": 11.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2025-06-06
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé
intersection_directions_fr—
SpotCharge · Owner-listed EV charging