SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsMaineBar Harbor
ME-699560

NERO: ACAD - 3

20 McFarland Dr, Bar Harbor, ME, 04609
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
NERO: ACAD - 3 · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

20 McFarland Dr · Bar Harbor, ME · 04609

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is NERO: ACAD - 3 located?
NERO: ACAD - 3 is located at 20 McFarland Dr, Bar Harbor, ME.
What kind of charging does NERO: ACAD - 3 offer?
NERO: ACAD - 3 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at NERO: ACAD - 3?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at NERO: ACAD - 3. Actual times vary with vehicle, temperature, and station load.
What are NERO: ACAD - 3's charging hours?
Open 24 hours
What charging network operates NERO: ACAD - 3?
NERO: ACAD - 3 is part of the Non-Networked network. See more Non-Networked charging across ME on SpotCharge.
Can anyone use the chargers at NERO: ACAD - 3?
NERO: ACAD - 3 is listed as by appointment access — check the details before visiting.
Is the NERO: ACAD - 3 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Maine · 2024
Plug-in vehicles
19K
#35 in US
Battery-electric
9.7K
51% of fleet
EVs per public port
12.2
1,550 ports listed

As of 2024, Maine had 18,900 plug-in vehicles registered — 9,700 fully battery-electric (51%) and 9,200 plug-in hybrid (49%). That ranks Maine #35 nationally and represents about 0.3% of all US plug-in registrations.

Across 1,550 publicly-listed ports in Maine (950 Level 2 and 600 DC fast), that works out to roughly 12.2 EVs per public port and 16.2 BEVs per DC fast port.

Maine has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Maine drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Maine market data →

More charging in Bar Harbor

See all →

Town of Bar Harbor - Park Street

Bar Harbor, ME

Level 2AMPUP
1 station · 4 ports7.2 kW

Indian Point - Blagden Preserve

Bar Harbor, ME

Level 2RIVIAN_WAYPOINTS
1 station · 2 ports7.2 kW

Steamboat Landing - Tesla Destination

Bar Harbor, ME

Level 2Tesla Destination
1 station · 4 ports7.2 kW

Hampton by Hilton Bar Harbor - Tesla Destination

Bar Harbor, ME

Level 2Tesla Destination
1 station · 6 ports7.2 kW
Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Last updated · 6 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging