SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsFloridaPlant City
FL-620357

HILLS COUNTY PLANT CITY 1

301 N Michigan Ave, Plant City, FL, 33563
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2012
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Finding this location

  • Plant City Courthouse. Unit is located off of Mahoney, curbside parking spaces.

    Source · NREL

Stations & ports

1 station · 2 ports
HILLS COUNTY PLANT CITY 1 · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

301 N Michigan Ave · Plant City, FL · 33563

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is HILLS COUNTY PLANT CITY 1 located?
HILLS COUNTY PLANT CITY 1 is located at 301 N Michigan Ave, Plant City, FL.
What kind of charging does HILLS COUNTY PLANT CITY 1 offer?
HILLS COUNTY PLANT CITY 1 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at HILLS COUNTY PLANT CITY 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at HILLS COUNTY PLANT CITY 1. Actual times vary with vehicle, temperature, and station load.
What are HILLS COUNTY PLANT CITY 1's charging hours?
Open 24 hours
What charging network operates HILLS COUNTY PLANT CITY 1?
HILLS COUNTY PLANT CITY 1 is part of the ChargePoint Network network. See more ChargePoint Network charging across FL on SpotCharge.
Can anyone use the chargers at HILLS COUNTY PLANT CITY 1?
Yes — HILLS COUNTY PLANT CITY 1 is a publicly accessible charging location.
Is the HILLS COUNTY PLANT CITY 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Florida · 2024
Plug-in vehicles
405K
#2 in US
Battery-electric
335K
83% of fleet
EVs per public port
29.7
13,661 ports listed

As of 2024, Florida had 405,200 plug-in vehicles registered — 334,800 fully battery-electric (83%) and 70,400 plug-in hybrid (17%). That ranks Florida #2 nationally and represents about 6.7% of all US plug-in registrations.

Across 13,661 publicly-listed ports in Florida (7,440 Level 2 and 6,219 DC fast), that works out to roughly 29.7 EVs per public port and 53.8 BEVs per DC fast port.

Florida's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Florida market data →

More charging in Plant City

See all →

Plant City Main Office

Plant City, FL

Level 2CHARGEUP
1 station · 4 ports7.2 kW

Jarrett Scott Ford

Plant City, FL

DC FastFORD_CHARGE
1 station · 2 ports50 kW

Century Lakehouse

Plant City, FL

Level 2LOOP
1 station · 6 ports7.2 kW

CITY FURNITURE PC OFFICES 3

Plant City, FL

Level 2ChargePoint Network
1 station · 1 port7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id48650
zip33563
cityPlant City
plus4—
stateFL
ng_psi—
cng_psi—
countryUS
latitude28.017569
bd_blends—
longitude-82.12125
open_date2012-06-30
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-06-12T01:19:45Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameHILLS COUNTY PLANT CITY 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "25158371",
    "25158381"
  ],
  "station": [
    "USCPIL217777"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address301 N Michigan Ave
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-06-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsPlant City Courthouse. Unit is located off of Mahoney, curbside parking spaces.
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging