SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsFloridaPlant City
FL-322191

Jarrett Scott Ford

2000 E Baker St, Plant City, FL, 33563
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
Max power
50 kW
DC fast
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Jarrett Scott Ford · DCFC CCS
FORD_CHARGE
DC fast · 50 kW
Start session on FORD_CHARGE network →
1ACCS· 50 kW· 480V/100A
1BCCS· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2000 E Baker St · Plant City, FL · 33563

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Jarrett Scott Ford located?
Jarrett Scott Ford is located at 2000 E Baker St, Plant City, FL.
What kind of charging does Jarrett Scott Ford offer?
Jarrett Scott Ford offers DC fast charging, with stations rated up to 50 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Jarrett Scott Ford?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at Jarrett Scott Ford. Actual times vary with vehicle, temperature, and station load.
What are Jarrett Scott Ford's charging hours?
Open 24 hours
What charging network operates Jarrett Scott Ford?
Jarrett Scott Ford is part of the FORD_CHARGE network. See more FORD_CHARGE charging across FL on SpotCharge.
Can anyone use the chargers at Jarrett Scott Ford?
Yes — Jarrett Scott Ford is a publicly accessible charging location.
Is the Jarrett Scott Ford listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Florida · 2024
Plug-in vehicles
405K
#2 in US
Battery-electric
335K
83% of fleet
EVs per public port
29.7
13,661 ports listed

As of 2024, Florida had 405,200 plug-in vehicles registered — 334,800 fully battery-electric (83%) and 70,400 plug-in hybrid (17%). That ranks Florida #2 nationally and represents about 6.7% of all US plug-in registrations.

Across 13,661 publicly-listed ports in Florida (7,440 Level 2 and 6,219 DC fast), that works out to roughly 29.7 EVs per public port and 53.8 BEVs per DC fast port.

Florida's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Florida market data →

More charging in Plant City

See all →

Plant City Main Office

Plant City, FL

Level 2CHARGEUP
1 station · 4 ports7.2 kW

Century Lakehouse

Plant City, FL

Level 2LOOP
1 station · 6 ports7.2 kW

CITY FURNITURE PC OFFICES 3

Plant City, FL

Level 2ChargePoint Network
1 station · 1 port7.2 kW

CITY FURNITURE PC SHOWROOM 1

Plant City, FL

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-357-1009
Network
FORD_CHARGE ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging