Kwik Trip #110
Ashland, WI
Wisconsin has 23 open DC fast charging sites built with National Electric Vehicle Infrastructure (NEVI) formula funding, with 156 DC fast ports and listed power up to 400 kW. Every one meets the federal four-port, 150 kW minimum and must stay online 97% of the time.
Data as of . Sources: OpenChargeMap, the US DOE Alternative Fuels Data Center, and OpenStreetMap, merged and refreshed weekly by SpotCharge; owner-managed listings are marked as such.
most common shown below
Ashland, WI
Brule, WI
Cameron, WI
Chippewa Falls, WI
Crandon, WI
Crivitz, WI
Fond Du Lac, WI
Hixton, WI
La Crosse, WI
Ladysmith, WI
Lake Delton, WI
Marinette, WI
Menomonie, WI
Milwaukee, WI
Mt. Horeb, WI
Pewaukee, WI
Plover, WI
Rhinelander, WI
Richfield, WI
Sheboygan, WI
St. Croix Falls, WI
Wausau, WI
Wausaukee, WI
Stations built with National Electric Vehicle Infrastructure (NEVI) formula money must meet federal minimum standards that most other public chargers do not have to.
At least four DC fast ports
Each site must have a minimum of four CCS ports, each able to deliver 150 kW at the same time, so a full row of cars charges at full speed.
97% uptime, measured
Operators must keep every port working at least 97% of the year and report reliability to the government, which is why NEVI sites tend to be well maintained.
Open to the public, around the clock
NEVI stations are on public property or open commercial sites, available 24 hours a day, with no membership required to charge.
Clear pricing you can pay without an app
Prices must be shown per kilowatt-hour before you plug in, and every site must accept contactless card payment alongside any network app.
On the highway corridors that matter
Sites are placed along federally designated Alternative Fuel Corridors, within a mile of the exit and no more than 50 miles apart, to make long trips practical.
Funding tags come from the U.S. Department of Energy’s Alternative Fuels Data Center, which lists a site as NEVI-funded once it is open. Awarded sites that have not opened yet are not shown here. Want the bigger picture? See the state EV market pages.
Looking more broadly? All DC fast charging in Wisconsin, every EV charger in Wisconsin, or NEVI sites in other states.