NEVI-funded EV charging in Kentucky

Kentucky has 17 open DC fast charging sites built with National Electric Vehicle Infrastructure (NEVI) formula funding, with 104 DC fast ports and listed power up to 400 kW. Every one meets the federal four-port, 150 kW minimum and must stay online 97% of the time.

Data as of . Sources: OpenChargeMap, the US DOE Alternative Fuels Data Center, and OpenStreetMap, merged and refreshed weekly by SpotCharge; owner-managed listings are marked as such.

NEVI sites open
17
DC fast ports
104
Max listed power
400 kW
Networks
5

most common shown below

Networks running NEVI sites in Kentucky

NEVI-funded charging locations in Kentucky

What every NEVI site in Kentucky guarantees

Stations built with National Electric Vehicle Infrastructure (NEVI) formula money must meet federal minimum standards that most other public chargers do not have to.

  • At least four DC fast ports

    Each site must have a minimum of four CCS ports, each able to deliver 150 kW at the same time, so a full row of cars charges at full speed.

  • 97% uptime, measured

    Operators must keep every port working at least 97% of the year and report reliability to the government, which is why NEVI sites tend to be well maintained.

  • Open to the public, around the clock

    NEVI stations are on public property or open commercial sites, available 24 hours a day, with no membership required to charge.

  • Clear pricing you can pay without an app

    Prices must be shown per kilowatt-hour before you plug in, and every site must accept contactless card payment alongside any network app.

  • On the highway corridors that matter

    Sites are placed along federally designated Alternative Fuel Corridors, within a mile of the exit and no more than 50 miles apart, to make long trips practical.

Funding tags come from the U.S. Department of Energy’s Alternative Fuels Data Center, which lists a site as NEVI-funded once it is open. Awarded sites that have not opened yet are not shown here. Want the bigger picture? See the state EV market pages.

Frequently asked questions

How many NEVI-funded charging stations are open in Kentucky?
SpotCharge lists 17 open NEVI-funded sites in Kentucky with 104 DC fast ports, based on the U.S. Department of Energy's Alternative Fuels Data Center. Sites awarded funding but not yet open are not counted.
Which networks operate NEVI stations in Kentucky?
The NEVI-funded sites in Kentucky are run by FCN (8), ChargePoint (5), Circle K (2), Electric Era (1). Each network page lists all of that network's locations in the state.
What does a NEVI-funded station in Kentucky guarantee?
Each site must have a minimum of four CCS ports, each able to deliver 150 kW at the same time, so a full row of cars charges at full speed. Operators must keep every port working at least 97% of the year and report reliability to the government, which is why NEVI sites tend to be well maintained. NEVI stations are on public property or open commercial sites, available 24 hours a day, with no membership required to charge. Prices must be shown per kilowatt-hour before you plug in, and every site must accept contactless card payment alongside any network app. Sites are placed along federally designated Alternative Fuel Corridors, within a mile of the exit and no more than 50 miles apart, to make long trips practical.
Is NEVI charging in Kentucky free?
No. NEVI pays for up to 80% of construction, but drivers pay the operator's normal rate. The program requires the per-kilowatt-hour price to be displayed before charging starts and contactless card payment at every site, so you do not need a network membership.

Looking more broadly? All DC fast charging in Kentucky, every EV charger in Kentucky, or NEVI sites in other states.