SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsWest VirginiaSummersville
WV-095114

SUMMERSVILLE WV SUMMERSVILLE

800 Northside Dr, Summersville, WV, 26651

SUMMERSVILLE WV SUMMERSVILLE is an EV charging location in Summersville, WV with 2 DC fast charging ports up to 63 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2025
Max power
62.5 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
SUMMERSVILLE WV SUMMERSVILLE · DCFC CHAdeMO 62.5 kW
ChargePoint Network
DC fast · 62.5 kW

62.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACHAdeMO· 62.5 kW
SUMMERSVILLE WV SUMMERSVILLE · DCFC CCS 62 kW
ChargePoint Network
DC fast · 62 kW

62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACCS· 62 kW

Estimated charging time

DC fast charging · 62.5 kW
~56 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

800 Northside Dr · Summersville, WV · 26651

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is SUMMERSVILLE WV SUMMERSVILLE located?
SUMMERSVILLE WV SUMMERSVILLE is located at 800 Northside Dr, Summersville, WV.
What kind of charging does SUMMERSVILLE WV SUMMERSVILLE offer?
SUMMERSVILLE WV SUMMERSVILLE offers DC fast charging, with stations rated up to 62.5 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at SUMMERSVILLE WV SUMMERSVILLE?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 56 min on 62.5 kW DC fast charging at SUMMERSVILLE WV SUMMERSVILLE. Actual times vary with vehicle, temperature, and station load.
What are SUMMERSVILLE WV SUMMERSVILLE's charging hours?
24 hours daily
What charging network operates SUMMERSVILLE WV SUMMERSVILLE?
SUMMERSVILLE WV SUMMERSVILLE is part of the ChargePoint network. See more ChargePoint charging across WV on SpotCharge.
Can anyone use the chargers at SUMMERSVILLE WV SUMMERSVILLE?
Yes — SUMMERSVILLE WV SUMMERSVILLE is a publicly accessible charging location.
Is the SUMMERSVILLE WV SUMMERSVILLE listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

West Virginia · 2024
Plug-in vehicles
6.0K
#47 in US
Battery-electric
3.8K
63% of fleet
EVs per public port
10.3
583 ports listed

As of 2024, West Virginia had 6,000 plug-in vehicles registered — 3,800 fully battery-electric (63%) and 2,200 plug-in hybrid (37%). That ranks West Virginia #47 nationally and represents about 0.1% of all US plug-in registrations.

Across 583 publicly-listed ports in West Virginia (290 Level 2 and 292 DC fast), that works out to roughly 10.3 EVs per public port and 13 BEVs per DC fast port.

West Virginia has comparatively strong public charging coverage today. Listing here keeps your stations visible as more West Virginia drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full West Virginia market data →

More DC fast charging

DC fast charging in Summersville →DC fast charging in West Virginia →ChargePoint in West Virginia →

More charging in Summersville

See all →

Northside Chevrolet

Summersville, WV

DC Fast
2 stations · 2 ports50 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 3 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id395679
zip26651
citySummersville
plus4—
stateWV
ng_psi—
cng_psi—
countryUS
latitude38.302167
bd_blends—
longitude-80.831248
open_date2025-05-15
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T03:01:30Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameSUMMERSVILLE WV SUMMERSVILLE
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "27378251"
  ],
  "station": [
    "USCPIL17450471"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address800 Northside Dr
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 62.5,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 62,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging