SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsWisconsinAppleton
WI-922210

NISSAN OF VLI VLI-L3-GP-4

2925 North Victory Lane, Appleton, WI, 54913

NISSAN OF VLI VLI-L3-GP-4 is an EV charging location in Appleton, WI with 1 DC fast charging port up to 49 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2025
Max power
49.4 kW
DC fast
Ports
1
port
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • outdoor dcfc

    Source · NREL

Stations & ports

1 station · 1 port
NISSAN OF VLI VLI-L3-GP-4 · DCFC CCS 49.4 kW
ChargePoint Network
DC fast · 49.4 kW

49.4 kW adds roughly 100 miles in about an hour, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 49.4 kW

Estimated charging time

DC fast charging · 49.4 kW
~1 h 11 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2925 North Victory Lane · Appleton, WI · 54913

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is NISSAN OF VLI VLI-L3-GP-4 located?
NISSAN OF VLI VLI-L3-GP-4 is located at 2925 North Victory Lane, Appleton, WI.
What kind of charging does NISSAN OF VLI VLI-L3-GP-4 offer?
NISSAN OF VLI VLI-L3-GP-4 offers DC fast charging, with stations rated up to 49.4 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at NISSAN OF VLI VLI-L3-GP-4?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 11 min on 49.4 kW DC fast charging at NISSAN OF VLI VLI-L3-GP-4. Actual times vary with vehicle, temperature, and station load.
What are NISSAN OF VLI VLI-L3-GP-4's charging hours?
24 hours daily
What charging network operates NISSAN OF VLI VLI-L3-GP-4?
NISSAN OF VLI VLI-L3-GP-4 is part of the ChargePoint network. See more ChargePoint charging across WI on SpotCharge.
Can anyone use the chargers at NISSAN OF VLI VLI-L3-GP-4?
Yes — NISSAN OF VLI VLI-L3-GP-4 is a publicly accessible charging location.
Is the NISSAN OF VLI VLI-L3-GP-4 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Wisconsin · 2024
Plug-in vehicles
47K
#27 in US
Battery-electric
32K
68% of fleet
EVs per public port
13.9
3,416 ports listed

As of 2024, Wisconsin had 47,400 plug-in vehicles registered — 32,300 fully battery-electric (68%) and 15,100 plug-in hybrid (32%). That ranks Wisconsin #27 nationally and represents about 0.8% of all US plug-in registrations.

Across 3,416 publicly-listed ports in Wisconsin (1,481 Level 2 and 1,926 DC fast), that works out to roughly 13.9 EVs per public port and 16.8 BEVs per DC fast port.

Wisconsin has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Wisconsin drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Wisconsin market data →

More DC fast charging

DC fast charging in Appleton →DC fast charging in Wisconsin →ChargePoint in Wisconsin →

More charging in Appleton

See all →

BERGSTROM EMC EMC-L2-BGP7

Appleton, WI

Level 2ChargePoint
1 station · 2 ports9.6 kW

Les Stumpf Ford

Appleton, WI

DC FastFord Charge
1 station · 4 ports120 kW

Baymont by Wyndham Appleton - Tesla Destination

Appleton, WI

Level 2Tesla Destination
2 stations · 8 ports14 kW

ENTECH EV BUB4K-2

Appleton, WI

Level 2ChargePoint
1 station · 1 port6.5 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 1 week ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id421164
zip54913
cityAppleton
plus4—
stateWI
ng_psi—
cng_psi—
countryUS
latitude44.29091
bd_blends—
longitude-88.47268
open_date2025-08-29
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-14T02:59:50Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameNISSAN OF VLI VLI-L3-GP-4
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "27762171"
  ],
  "station": [
    "USCPIL17771531"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address2925 North Victory Lane
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 49.4,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-14
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsoutdoor dcfc
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging