SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsWisconsinStoughton
WI-792695

SH EE LOT STATION 4

105 Church St, Stoughton, WI, 53589
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
1
port
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 1 port
SH EE LOT STATION 4 · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

105 Church St · Stoughton, WI · 53589

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is SH EE LOT STATION 4 located?
SH EE LOT STATION 4 is located at 105 Church St, Stoughton, WI.
What kind of charging does SH EE LOT STATION 4 offer?
SH EE LOT STATION 4 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at SH EE LOT STATION 4?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at SH EE LOT STATION 4. Actual times vary with vehicle, temperature, and station load.
What are SH EE LOT STATION 4's charging hours?
Open 24 hours
What charging network operates SH EE LOT STATION 4?
SH EE LOT STATION 4 is part of the ChargePoint Network network. See more ChargePoint Network charging across WI on SpotCharge.
Can anyone use the chargers at SH EE LOT STATION 4?
Yes — SH EE LOT STATION 4 is a publicly accessible charging location.
Is the SH EE LOT STATION 4 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Wisconsin · 2024
Plug-in vehicles
47K
#27 in US
Battery-electric
32K
68% of fleet
EVs per public port
20.1
2,360 ports listed

As of 2024, Wisconsin had 47,400 plug-in vehicles registered — 32,300 fully battery-electric (68%) and 15,100 plug-in hybrid (32%). That ranks Wisconsin #27 nationally and represents about 0.8% of all US plug-in registrations.

Across 2,360 publicly-listed ports in Wisconsin (1,167 Level 2 and 1,184 DC fast), that works out to roughly 20.1 EVs per public port and 27.3 BEVs per DC fast port.

Wisconsin's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Wisconsin market data →

More charging in Stoughton

See all →

GREENSPIRE JOULE

Stoughton, WI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

GREENSPIRE ZAPPY

Stoughton, WI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

GREENSPIRE JOLT

Stoughton, WI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

GREENSPIRE FUNPHOTON

Stoughton, WI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging