SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsWisconsinLadysmith
WI-737456

Jump River Electric Cooperative

1102 West 9th Street North, Ladysmith, WI, 54848

Jump River Electric Cooperative is an EV charging location in Ladysmith, WI with 1 Level 2 charging port up to 7 kW on the ZEFNET network. Public access. Listing data from NREL, last confirmed October 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
6.7 kW
AC Level 2
Ports
1
port
Hours
—
Pricing
—

Stations & ports

1 station · 1 port
Jump River Electric Cooperative · L2 J1772 6.7 kW
ZEFNET
AC L2 · 6.7 kW

6.7 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ZEFNET network →
1AJ1772· 6.7 kW

Estimated charging time

Level 2 (AC) · 6.7 kW
~8 h 42 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1102 West 9th Street North · Ladysmith, WI · 54848

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Jump River Electric Cooperative located?
Jump River Electric Cooperative is located at 1102 West 9th Street North, Ladysmith, WI.
What kind of charging does Jump River Electric Cooperative offer?
Jump River Electric Cooperative offers Level 2 (AC) charging, with stations rated up to 6.7 kW. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at Jump River Electric Cooperative?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 42 min on 6.7 kW Level 2 (AC) charging at Jump River Electric Cooperative. Actual times vary with vehicle, temperature, and station load.
What charging network operates Jump River Electric Cooperative?
Jump River Electric Cooperative is part of the ZEFNET network. See more ZEFNET charging across WI on SpotCharge.
Can anyone use the chargers at Jump River Electric Cooperative?
Yes — Jump River Electric Cooperative is a publicly accessible charging location.
Is the Jump River Electric Cooperative listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Wisconsin · 2024
Plug-in vehicles
47K
#27 in US
Battery-electric
32K
68% of fleet
EVs per public port
13.6
3,484 ports listed

As of 2024, Wisconsin had 47,400 plug-in vehicles registered — 32,300 fully battery-electric (68%) and 15,100 plug-in hybrid (32%). That ranks Wisconsin #27 nationally and represents about 0.8% of all US plug-in registrations.

Across 3,484 publicly-listed ports in Wisconsin (1,515 Level 2 and 1,960 DC fast), that works out to roughly 13.6 EVs per public port and 16.5 BEVs per DC fast port.

Wisconsin has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Wisconsin drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Wisconsin market data →

More charging in Ladysmith

See all →

FairBridge Inn Express - Ladysmith

Ladysmith, WI

DC FastFCN
1 station · 4 ports400 kW

Jump River Electric Coop

Ladysmith, WI

Level 2
1 station · 2 ports8 kW
Tesla Destination chargers to right of picture. Fun taco joint, good food!

Taco Theory

Ladysmith, WI

Level 2Tesla Destination
1 station · 2 ports10 kW
Details
Phone
888-493-3638
Network
ZEFNET ↗
Access
Public access

Verified by NREL · 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center76 fields▾

From U.S. DOE AFDC · Public domain

id332430
zip54848
cityLadysmith
plus4—
stateWI
ng_psi—
cng_psi—
countryUS
latitude45.4774
bd_blends—
longitude-91.11218
open_date2024-04-16
rd_blends—
ev_networkZEFNET
ev_pricing—
unverifiedNo
updated_at2026-10-31T05:11:48Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameJump River Electric Cooperative
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-493-3638
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "BVD7z8MAN"
  ],
  "station": [
    "v0sRE1eJo"
  ]
}
ev_network_webhttps://www.zefenergy.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address1102 West 9th Street North
funding_sources—
owner_type_code—
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ZEFNET",
    "connectors": {
      "J1772": {
        "power_kw": 6.7,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2026-10-31
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging