SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsWisconsinWashburn
WI-729551

Bay Area Rural Transit, Washburn

615 615 second Ave east, Washburn, WI, 54891

Bay Area Rural Transit, Washburn is an EV charging location in Washburn, WI with 2 DC fast charging ports up to 70 kW on the evGateway network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2021
Max power
70 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
Bay Area Rural Transit, Washburn · DCFC CCS 70 kW
EVGATEWAY
DC fast · 70 kW

70 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on EVGATEWAY network →
1ACCS· 70 kW
Bay Area Rural Transit, Washburn · DCFC CHAdeMO 70 kW
EVGATEWAY
DC fast · 70 kW

70 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on EVGATEWAY network →
2ACHAdeMO· 70 kW

Estimated charging time

DC fast charging · 70 kW
~50 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

615 615 second Ave east · Washburn, WI · 54891

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Bay Area Rural Transit, Washburn located?
Bay Area Rural Transit, Washburn is located at 615 615 second Ave east, Washburn, WI.
What kind of charging does Bay Area Rural Transit, Washburn offer?
Bay Area Rural Transit, Washburn offers DC fast charging, with stations rated up to 70 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at Bay Area Rural Transit, Washburn?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 50 min on 70 kW DC fast charging at Bay Area Rural Transit, Washburn. Actual times vary with vehicle, temperature, and station load.
What are Bay Area Rural Transit, Washburn's charging hours?
24 hours daily
What charging network operates Bay Area Rural Transit, Washburn?
Bay Area Rural Transit, Washburn is part of the evGateway network. See more evGateway charging across WI on SpotCharge.
Can anyone use the chargers at Bay Area Rural Transit, Washburn?
Yes — Bay Area Rural Transit, Washburn is a publicly accessible charging location.
Is the Bay Area Rural Transit, Washburn listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Wisconsin · 2024
Plug-in vehicles
47K
#27 in US
Battery-electric
32K
68% of fleet
EVs per public port
13.9
3,418 ports listed

As of 2024, Wisconsin had 47,400 plug-in vehicles registered — 32,300 fully battery-electric (68%) and 15,100 plug-in hybrid (32%). That ranks Wisconsin #27 nationally and represents about 0.8% of all US plug-in registrations.

Across 3,418 publicly-listed ports in Wisconsin (1,481 Level 2 and 1,928 DC fast), that works out to roughly 13.9 EVs per public port and 16.8 BEVs per DC fast port.

Wisconsin has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Wisconsin drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Wisconsin market data →

More DC fast charging

DC fast charging in Washburn →DC fast charging in Wisconsin →evGateway in Wisconsin →

More charging in Washburn

See all →

Bay Area Rural Transit

Washburn, WI

DC FastevGateway
2 stations · 2 ports50 kW

BART DC EV Charger

Washburn, WI

DC Fast
2 stations · 2 ports50 kW
Details
Hours
24 hours daily
Phone
949-945-2000
Network
evGateway ↗
Access
Public access

Verified by NREL · 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id203274
zip54891
cityWashburn
plus4—
stateWI
ng_psi—
cng_psi—
countryUS
latitude46.67825928
bd_blends—
longitude-90.89320063
open_date2021-09-29
rd_blends—
ev_networkEVGATEWAY
ev_pricing—
updated_at2026-09-16T05:08:32Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameBay Area Rural Transit, Washburn
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone949-945-2000
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "6ba0588d-10c7-4175-812e-c605991ec6b3",
    "bf582426-6935-49cd-ba7a-5a367b8ae2cd"
  ],
  "station": [
    "46868e8b-93d0-4ba7-9a6e-7c0d7052b985"
  ]
}
ev_network_webhttps://evgateway.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address615 615 second Ave east
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "EVGATEWAY",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 70,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "EVGATEWAY",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 70,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-16
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging