SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsWisconsinMerrill
WI-348191

BPC LEVEL 3-2

3000 E Main St, Merrill, WI, 54452
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
50 kW
DC fast
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

2 stations · 2 ports
BPC LEVEL 3-2 · DCFC Tesla
ChargePoint Network
DC fast · 50 kW
Start session on ChargePoint Network network →
1ATesla· 50 kW· 480V/100A
BPC LEVEL 3-2 · DCFC CCS
ChargePoint Network
DC fast · 50 kW
Start session on ChargePoint Network network →
2ACCS· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

3000 E Main St · Merrill, WI · 54452

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is BPC LEVEL 3-2 located?
BPC LEVEL 3-2 is located at 3000 E Main St, Merrill, WI.
What kind of charging does BPC LEVEL 3-2 offer?
BPC LEVEL 3-2 offers DC fast charging, with stations rated up to 50 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at BPC LEVEL 3-2?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging at BPC LEVEL 3-2. Actual times vary with vehicle, temperature, and station load.
What are BPC LEVEL 3-2's charging hours?
Open 24 hours
What charging network operates BPC LEVEL 3-2?
BPC LEVEL 3-2 is part of the ChargePoint Network network. See more ChargePoint Network charging across WI on SpotCharge.
Can anyone use the chargers at BPC LEVEL 3-2?
Yes — BPC LEVEL 3-2 is a publicly accessible charging location.
Is the BPC LEVEL 3-2 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Wisconsin · 2024
Plug-in vehicles
47K
#27 in US
Battery-electric
32K
68% of fleet
EVs per public port
20.1
2,360 ports listed

As of 2024, Wisconsin had 47,400 plug-in vehicles registered — 32,300 fully battery-electric (68%) and 15,100 plug-in hybrid (32%). That ranks Wisconsin #27 nationally and represents about 0.8% of all US plug-in registrations.

Across 2,360 publicly-listed ports in Wisconsin (1,167 Level 2 and 1,184 DC fast), that works out to roughly 20.1 EVs per public port and 27.3 BEVs per DC fast port.

Wisconsin's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Wisconsin market data →

More charging in Merrill

See all →

BPC LEVEL2 STATION4

Merrill, WI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Wheelers Chevrolet of Merrill

Merrill, WI

Level 2FLO
1 station · 1 port7.2 kW

Pine Ridge Mobil - Tesla Destination

Merrill, WI

Level 2Tesla Destination
1 station · 1 port7.2 kW
AmericInn by Wyndham Merrill

AmericInn by Wyndham Merrill

Merrill, WI

Level 2Tesla Destination
1 station · 1 port10 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging