WSDOT ORMAFF
Lacey, WA
The PSE Up & Go Electric public charging station is located at the Hub at Lacey. It's open 24/7 with dedicated parking for EVs.
Up & Go Electric charging station provided by Puget Sound Energy and operated by Greenlots. Mobile payment, charge monitoring and more with either PSE Up & Go Electric or Greenlots app. Features multiple Level 2 and DC fast charger ports and dedicated EV parking. Energy purchased at station is matched with 100 percent renewable energy through PSE’s Green Power program.
Source · OpenChargeMap
For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →
No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.
Charged here? Tell the next driver how it went:
No reviews yet — be the first to charge here and share your experience.
As of 2024, Washington had 239,900 plug-in vehicles registered — 191,400 fully battery-electric (80%) and 48,500 plug-in hybrid (20%). That ranks Washington #5 nationally and represents about 4.0% of all US plug-in registrations.
Across 7,415 publicly-listed ports in Washington (4,497 Level 2 and 2,899 DC fast), that works out to roughly 32.4 EVs per public port and 66 BEVs per DC fast port.
Washington's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.
Source: AFDC (data from Experian Information Solutions) · See full Washington market data →
Lacey, WA
Lacey, WA
Lacey, WA
Lacey, WA
Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.
From OpenChargeMap · CC-BY-SA 4.0
| ID | 167274 |
|---|---|
| UUID | F86BC9AE-ED77-438E-AD32-B48BCFB15DE7 |
| UsageCost | L2 = $0.28/kWh; DCFC = $0.42/kWh |
| MediaItems | [
{
"ID": 24654,
"User": {
"ID": 27425,
"Username": "MichaelHarthorne"
},
"Comment": "",
"IsVideo": false,
"ItemURL": "https://media.openchargemap.io/images/US/OCM167274/OCM-167274.orig.2020091122020223.jpg",
"IsEnabled": true,
"DateCreated": "2020-09-11T22:02:00Z",
"ChargePointID": 167274,
"IsFeaturedItem": false,
"ItemThumbnailURL": "https://media.openchargemap.io/images/US/OCM167274/OCM-167274.thmb.2020091122020223.jpg",
"IsExternalResource": false
},
{
"ID": 24653,
"User": {
"ID": 27425,
"Username": "MichaelHarthorne"
},
"Comment": "",
"IsVideo": false,
"ItemURL": "https://media.openchargemap.io/images/US/OCM167274/OCM-167274.orig.2020091122010812.jpg",
"IsEnabled": true,
"DateCreated": "2020-09-11T22:01:00Z",
"ChargePointID": 167274,
"IsFeaturedItem": false,
"ItemThumbnailURL": "https://media.openchargemap.io/images/US/OCM167274/OCM-167274.thmb.2020091122010812.jpg",
"IsExternalResource": false
}
] |
| OperatorID | 59 |
| AddressInfo | {
"ID": 167633,
"Town": "Lacey",
"Title": "The Hub at Lacey",
"Latitude": 47.041783720021954,
"Postcode": "98503",
"CountryID": 2,
"Longitude": -122.8259167746391,
"RelatedURL": "https://www.pse.com/pages/electric-cars/charging-with-pse",
"AddressLine1": "676 Woodland Square Loop SE",
"ContactEmail": "psesupport@greenlots.com",
"DistanceUnit": 0,
"AccessComments": "The PSE Up & Go Electric public charging station is located at the Hub at Lacey. It's open 24/7 with dedicated parking for EVs.",
"StateOrProvince": "WA",
"ContactTelephone1": "1-877-251-7655"
} |
| Connections | [
{
"ID": 253319,
"LevelID": 3,
"PowerKW": 50,
"Quantity": 2,
"StatusTypeID": 50,
"CurrentTypeID": 30,
"ConnectionTypeID": 32
},
{
"ID": 253320,
"LevelID": 3,
"PowerKW": 50,
"Quantity": 2,
"StatusTypeID": 50,
"CurrentTypeID": 30,
"ConnectionTypeID": 2
},
{
"ID": 253322,
"LevelID": 2,
"PowerKW": 7.2,
"Voltage": 240,
"Quantity": 4,
"StatusTypeID": 50,
"CurrentTypeID": 10,
"ConnectionTypeID": 1
}
] |
| DateCreated | 2020-09-04T20:05:00Z |
| UsageTypeID | 1 |
| OperatorInfo | {
"ID": 59,
"Title": "Shell Recharge Solutions (US)",
"Comments": null,
"BookingURL": null,
"WebsiteURL": "https://shellrecharge.com/en-us/solutions",
"AddressInfo": null,
"ContactEmail": null,
"FaultReportEmail": null,
"IsRestrictedEdit": false,
"IsPrivateIndividual": false,
"PhonePrimaryContact": null,
"PhoneSecondaryContact": null
} |
| StatusTypeID | 50 |
| DataProviderID | 1 |
| NumberOfPoints | 2 |
| GeneralComments | Up & Go Electric charging station provided by Puget Sound Energy and operated by Greenlots. Mobile payment, charge monitoring and more with either PSE Up & Go Electric or Greenlots app. Features multiple Level 2 and DC fast charger ports and dedicated EV parking. Energy purchased at station is matched with 100 percent renewable energy through PSE’s Green Power program. |
| DateLastVerified | 2023-11-28T03:34:00Z |
| DateLastStatusUpdate | 2023-11-28T03:34:00Z |
| SubmissionStatusTypeID | 200 |