SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsWashingtonOtis Orchards
WA-697097

Otis Orchards Library

22324 E Wellesley Ave, Otis Orchards, WA, 99027

Otis Orchards Library is an EV charging location in Otis Orchards, WA with 2 Level 2 charging ports on the EV Connect network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Public access. Listing data from NREL, last confirmed June 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
—
AC Level 2
Ports
2
ports
Hours
—
Pricing
—

Stations & ports

1 station · 2 ports
Otis Orchards Library · L2 J1772
EV Connect
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on EV Connect network →
1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

22324 E Wellesley Ave · Otis Orchards, WA · 99027

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Otis Orchards Library located?
Otis Orchards Library is located at 22324 E Wellesley Ave, Otis Orchards, WA.
What kind of charging does Otis Orchards Library offer?
Otis Orchards Library offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Otis Orchards Library?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Otis Orchards Library. Actual times vary with vehicle, temperature, and station load.
What charging network operates Otis Orchards Library?
Otis Orchards Library is part of the EV Connect network. See more EV Connect charging across WA on SpotCharge.
Can anyone use the chargers at Otis Orchards Library?
Yes — Otis Orchards Library is a publicly accessible charging location.
Is the Otis Orchards Library listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Washington · 2024
Plug-in vehicles
240K
#5 in US
Battery-electric
191K
80% of fleet
EVs per public port
—
no port data

As of 2024, Washington had 239,900 plug-in vehicles registered — 191,400 fully battery-electric (80%) and 48,500 plug-in hybrid (20%). That ranks Washington #5 nationally and represents about 4.0% of all US plug-in registrations.

Every EV registered in Washington is a potential repeat visitor. Listing charging at this location helps drivers find you and builds trust with the local EV community.

Source: AFDC (data from Experian Information Solutions) · See full Washington market data →

Details
Phone
866-816-7584
Network
EV Connect ↗
Access
Public access

Last updated · 3 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging