SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsWashingtonLacey
WA-579111

The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey

676 Woodland Square Loop SE, Lacey, WA, 98503

The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey is an EV charging location in Lacey, WA with 8 DC fast and Level 2 charging ports up to 150 kW on the EV Connect network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2020
Max power
150 kW
DC fast
Ports
8
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

3 stations · 8 ports
The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey · DCFC CCS 150 kW
EV Connect
DC fast · 150 kW

150 kW can add 100 miles or more in 15 to 25 minutes, depending on the car.

Start session on EV Connect network →
1ACCS· 150 kW
1BCCS· 150 kW
The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey · DCFC CHAdeMO 100 kW
EV Connect
DC fast · 100 kW

100 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on EV Connect network →
2ACHAdeMO· 100 kW
2BCHAdeMO· 100 kW
The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey · L2 J1772 9.6 kW
EV Connect
AC L2 · 9.6 kW

9.6 kW adds roughly 35 miles of range per hour for a typical EV.

Start session on EV Connect network →
3AJ1772· 9.6 kW
3BJ1772· 9.6 kW
3CJ1772· 9.6 kW
3DJ1772· 9.6 kW

Estimated charging time

DC fast charging · 150 kW
~23 min
Level 2 (AC) · 9.6 kW
~6 h 5 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

676 Woodland Square Loop SE · Lacey, WA · 98503

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey located?
The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey is located at 676 Woodland Square Loop SE, Lacey, WA.
What kind of charging does The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey offer?
The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey offers DC fast charging and Level 2 (AC) charging, with stations rated up to 150 kW. There are 3 charging stations and 8 total ports at this location.
How long does it take to charge an EV at The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 23 min on 150 kW DC fast charging, or about 6 h 5 min on 9.6 kW Level 2 (AC) charging at The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey. Actual times vary with vehicle, temperature, and station load.
What are The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey's charging hours?
24 hours daily
What charging network operates The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey?
The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey is part of the EV Connect network. See more EV Connect charging across WA on SpotCharge.
Can anyone use the chargers at The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey?
Yes — The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey is a publicly accessible charging location.
Is the The Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Washington · 2024
Plug-in vehicles
240K
#5 in US
Battery-electric
191K
80% of fleet
EVs per public port
28.9
8,312 ports listed

As of 2024, Washington had 239,900 plug-in vehicles registered — 191,400 fully battery-electric (80%) and 48,500 plug-in hybrid (20%). That ranks Washington #5 nationally and represents about 4.0% of all US plug-in registrations.

Across 8,312 publicly-listed ports in Washington (5,066 Level 2 and 3,227 DC fast), that works out to roughly 28.9 EVs per public port and 59.3 BEVs per DC fast port.

Washington's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Washington market data →

More DC fast charging

DC fast charging in Lacey →DC fast charging in Washington →EV Connect in Washington →

More charging in Lacey

See all →

WSDOT ORMAFF

Lacey, WA

Level 2
1 station · 2 ports

DOC2603

Lacey, WA

Level 2
1 station · 2 ports

MARTINGALE APTS BLDG 2 RIGHT

Lacey, WA

Level 2ChargePoint
1 station · 1 port9.6 kW

MARTINGALE APTS BLDG 8 W RIGHT

Lacey, WA

Level 2ChargePoint
1 station · 1 port9.6 kW
Details
Hours
24 hours daily
Phone
866-816-7584
Network
EV Connect ↗
Access
Public access

Verified by NREL · 4 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id166926
zip98503
cityLacey
plus4—
stateWA
ng_psi—
cng_psi—
countryUS
latitude47.041828
bd_blends—
longitude-122.825276
open_date2020-09-18
rd_blends—
ev_networkEV Connect
ev_pricing—
updated_at2026-09-16T04:07:04Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameThe Hub at Lacey Office Space: 676 Woodland Square Loop SE, Lacey
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone866-816-7584
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "68017b42ea6b2428d2aa0aa1",
    "68017b698d2cf67d9efc0032",
    "68017b9530ae8d0dd618df1e",
    "68017b9530ae8d0dd618df1f",
    "68017bcf8d2cf67d9efc0034",
    "68017bcf8d2cf67d9efc0035"
  ],
  "station": [
    "a74ebe44-3671-441d-8640-456856abd6c8"
  ]
}
ev_network_webhttps://www.evconnect.com
fuel_type_codeELEC
geocode_status200-9
hy_status_link—
street_address676 Woodland Square Loop SE
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "EV Connect",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 100,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 150,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "EV Connect",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 100,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 150,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "EV Connect",
    "connectors": {
      "J1772": {
        "power_kw": 9.6,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "EV Connect",
    "connectors": {
      "J1772": {
        "power_kw": 9.6,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "EV Connect",
    "connectors": {
      "J1772": {
        "power_kw": 9.6,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "EV Connect",
    "connectors": {
      "J1772": {
        "power_kw": 9.6,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num4
access_days_time_fr—
date_last_confirmed2026-09-16
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging