SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsWashingtonRichland
WA-482636

Pacific Northwest National Laboratory PNNL/RTL

RTL, Richland, WA, 99354
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
Free
Free

Stations & ports

2 stations · 2 ports
Pacific Northwest National Laboratory PNNL/RTL · L1 J1772
Non-Networked
AC L2 · 1.4 kW
1AJ1772· 1.4 kW· 120V/12A
Pacific Northwest National Laboratory PNNL/RTL · L2 J1772
Non-Networked
AC L2 · 7.2 kW
2AJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

RTL · Richland, WA · 99354

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Pacific Northwest National Laboratory PNNL/RTL located?
Pacific Northwest National Laboratory PNNL/RTL is located at RTL, Richland, WA.
What kind of charging does Pacific Northwest National Laboratory PNNL/RTL offer?
Pacific Northwest National Laboratory PNNL/RTL offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at Pacific Northwest National Laboratory PNNL/RTL?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Pacific Northwest National Laboratory PNNL/RTL. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Pacific Northwest National Laboratory PNNL/RTL?
Free
What are Pacific Northwest National Laboratory PNNL/RTL's charging hours?
Open 24 hours
What charging network operates Pacific Northwest National Laboratory PNNL/RTL?
Pacific Northwest National Laboratory PNNL/RTL is part of the Non-Networked network. See more Non-Networked charging across WA on SpotCharge.
Can anyone use the chargers at Pacific Northwest National Laboratory PNNL/RTL?
Pacific Northwest National Laboratory PNNL/RTL is listed as by appointment access — check the details before visiting.
Is the Pacific Northwest National Laboratory PNNL/RTL listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Washington · 2024
Plug-in vehicles
240K
#5 in US
Battery-electric
191K
80% of fleet
EVs per public port
32.4
7,415 ports listed

As of 2024, Washington had 239,900 plug-in vehicles registered — 191,400 fully battery-electric (80%) and 48,500 plug-in hybrid (20%). That ranks Washington #5 nationally and represents about 4.0% of all US plug-in registrations.

Across 7,415 publicly-listed ports in Washington (4,497 Level 2 and 2,899 DC fast), that works out to roughly 32.4 EVs per public port and 66 BEVs per DC fast port.

Washington's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Washington market data →

More charging in Richland

See all →

DOC2719

Richland, WA

Level 2Non-Networked
1 station · 2 ports7.2 kW

CRESWELL BELL BADGER MT

Richland, WA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

ICCU RICH-22-3

Richland, WA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

PNNL / GES

Richland, WA

Level 2Non-Networked
1 station · 5 ports1.4 kW
Details
Hours
Open 24 hours
Pricing
Free
Network
Non-Networked
Access
By appointment

Last updated · 6 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging