SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsWashingtonKennewick
WA-305266

ADMIN BUILDING PUBLIC PARKING

7122 W Okanogan Pl, Kennewick, WA, 99336
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
ADMIN BUILDING PUBLIC PARKING · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

7122 W Okanogan Pl · Kennewick, WA · 99336

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is ADMIN BUILDING PUBLIC PARKING located?
ADMIN BUILDING PUBLIC PARKING is located at 7122 W Okanogan Pl, Kennewick, WA.
What kind of charging does ADMIN BUILDING PUBLIC PARKING offer?
ADMIN BUILDING PUBLIC PARKING offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at ADMIN BUILDING PUBLIC PARKING?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at ADMIN BUILDING PUBLIC PARKING. Actual times vary with vehicle, temperature, and station load.
What are ADMIN BUILDING PUBLIC PARKING's charging hours?
Open 24 hours
What charging network operates ADMIN BUILDING PUBLIC PARKING?
ADMIN BUILDING PUBLIC PARKING is part of the ChargePoint Network network. See more ChargePoint Network charging across WA on SpotCharge.
Can anyone use the chargers at ADMIN BUILDING PUBLIC PARKING?
Yes — ADMIN BUILDING PUBLIC PARKING is a publicly accessible charging location.
Is the ADMIN BUILDING PUBLIC PARKING listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Washington · 2024
Plug-in vehicles
240K
#5 in US
Battery-electric
191K
80% of fleet
EVs per public port
32.4
7,415 ports listed

As of 2024, Washington had 239,900 plug-in vehicles registered — 191,400 fully battery-electric (80%) and 48,500 plug-in hybrid (20%). That ranks Washington #5 nationally and represents about 4.0% of all US plug-in registrations.

Across 7,415 publicly-listed ports in Washington (4,497 Level 2 and 2,899 DC fast), that works out to roughly 32.4 EVs per public port and 66 BEVs per DC fast port.

Washington's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Washington market data →

More charging in Kennewick

See all →

2901 Southridge Blvd

Kennewick, WA

DC FastCHARGELAB
2 stations · 2 ports50 kW

PM COMPUTER BLDG F SW

Kennewick, WA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

PM COMPUTER BLDG G EAST

Kennewick, WA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

PM COMPUTER BLDG E SOUTH

Kennewick, WA

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging