SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsWashingtonAshford
WA-048256

Mount Rainier National Park

55210 238th Ave E, Ashford, WA, 98304

Mount Rainier National Park is a natl park in Ashford, WA with 1 Level 2 charging port, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. By appointment. Listing data from NREL, last confirmed January 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Natl park
📅Open since 2019
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
1
port
Hours
—
Pricing
—

Stations & ports

1 station · 1 port
Mount Rainier National Park · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

55210 238th Ave E · Ashford, WA · 98304

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Mount Rainier National Park located?
Mount Rainier National Park is located at 55210 238th Ave E, Ashford, WA.
What kind of charging does Mount Rainier National Park offer?
Mount Rainier National Park offers Level 2 (AC) charging. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at Mount Rainier National Park?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Mount Rainier National Park. Actual times vary with vehicle, temperature, and station load.
Can anyone use the chargers at Mount Rainier National Park?
Mount Rainier National Park is listed as by appointment access (Government use only) — check the details before visiting. NREL lists it as workplace charging, mainly for employees.
Is the Mount Rainier National Park listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Washington · 2024
Plug-in vehicles
240K
#5 in US
Battery-electric
191K
80% of fleet
EVs per public port
28.9
8,312 ports listed

As of 2024, Washington had 239,900 plug-in vehicles registered — 191,400 fully battery-electric (80%) and 48,500 plug-in hybrid (20%). That ranks Washington #5 nationally and represents about 4.0% of all US plug-in registrations.

Across 8,312 publicly-listed ports in Washington (5,066 Level 2 and 3,227 DC fast), that works out to roughly 28.9 EVs per public port and 59.3 BEVs per DC fast port.

Washington's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Washington market data →

More charging in Ashford

See all →

Rainier Basecamp LLC

Ashford, WA

DC FastLevel 2EVCS
4 stations · 9 ports200 kW

National Park Service - Longmire Administration Building

Ashford, WA

Level 2
1 station · 1 port

Wellspring Spa at Mount Rainier

Ashford, WA

Level 2
1 station · 4 ports

Alexander's Lodge and Restaurant - Tesla

Ashford, WA

Level 2Tesla Destination
1 station · 2 ports8 kW
Details
Network
Non-networked
Access
By appointment · Government use only
Workplace charging, mainly for employees · From NREL
Ownership
Federal government
From NREL

Verified by NREL · 8 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id61948
zip98304
cityAshford
plus4—
stateWA
ng_psi—
cng_psi—
countryUS
latitude46.755816
bd_blends—
longitude-122.120894
open_date2019-07-15
rd_blends—
ev_networkNon-Networked
ev_pricing—
updated_at2026-02-02T23:16:24Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMount Rainier National Park
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeNATL_PARK
nps_unit_nameMount Rainier National Park
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_web—
federal_agency
{
  "id": 16,
  "code": "DOI",
  "name": "Department of the Interior"
}
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address55210 238th Ave E
funding_sources—
owner_type_codeFG
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_codeGOVERNMENT
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2026-01-13
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate - Government only
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé - Réservé au gouvernement
intersection_directions_fr—
SpotCharge · Owner-listed EV charging