SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsVermontWilliston
VT-929853

Hannaford Williston

78 Marshall Ave, Williston, VT, 05495
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Hannaford Williston · L2 J1772
VIALYNK
AC L2 · 7.2 kW
Start session on VIALYNK network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

78 Marshall Ave · Williston, VT · 05495

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Hannaford Williston located?
Hannaford Williston is located at 78 Marshall Ave, Williston, VT.
What kind of charging does Hannaford Williston offer?
Hannaford Williston offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Hannaford Williston?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Hannaford Williston. Actual times vary with vehicle, temperature, and station load.
What are Hannaford Williston's charging hours?
Open 24 hours
What charging network operates Hannaford Williston?
Hannaford Williston is part of the VIALYNK network. See more VIALYNK charging across VT on SpotCharge.
Can anyone use the chargers at Hannaford Williston?
Yes — Hannaford Williston is a publicly accessible charging location.
Is the Hannaford Williston listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Vermont · 2024
Plug-in vehicles
17K
#37 in US
Battery-electric
10K
60% of fleet
EVs per public port
14.3
1,192 ports listed

As of 2024, Vermont had 17,100 plug-in vehicles registered — 10,200 fully battery-electric (60%) and 6,900 plug-in hybrid (40%). That ranks Vermont #37 nationally and represents about 0.3% of all US plug-in registrations.

Across 1,192 publicly-listed ports in Vermont (787 Level 2 and 405 DC fast), that works out to roughly 14.3 EVs per public port and 25.2 BEVs per DC fast port.

Vermont has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Vermont drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Vermont market data →

More charging in Williston

See all →

HOLLAND TPS2

Williston, VT

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

Green Mountain Power - Williston Hannaford

Williston, VT

DC FastFLO
2 stations · 2 ports50 kW

TCE AQ WIL TCE-BOWMAN-VT

Williston, VT

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

BERLIN CITY KIA STATION 1

Williston, VT

DC FastChargePoint Network
2 stations · 2 ports50 kW
Details
Hours
Open 24 hours
Phone
833-611-5965
Network
VIALYNK ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging