SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsVermontSaint Albans City
VT-559786

HARD'ACK HARD'ACK

30 Eastview Dr, Saint Albans City, VT, 05478
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
HARD'ACK HARD'ACK · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

30 Eastview Dr · Saint Albans City, VT · 05478

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is HARD'ACK HARD'ACK located?
HARD'ACK HARD'ACK is located at 30 Eastview Dr, Saint Albans City, VT.
What kind of charging does HARD'ACK HARD'ACK offer?
HARD'ACK HARD'ACK offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at HARD'ACK HARD'ACK?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at HARD'ACK HARD'ACK. Actual times vary with vehicle, temperature, and station load.
What are HARD'ACK HARD'ACK's charging hours?
Open 24 hours
What charging network operates HARD'ACK HARD'ACK?
HARD'ACK HARD'ACK is part of the ChargePoint Network network. See more ChargePoint Network charging across VT on SpotCharge.
Can anyone use the chargers at HARD'ACK HARD'ACK?
Yes — HARD'ACK HARD'ACK is a publicly accessible charging location.
Is the HARD'ACK HARD'ACK listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Vermont · 2024
Plug-in vehicles
17K
#37 in US
Battery-electric
10K
60% of fleet
EVs per public port
14.3
1,192 ports listed

As of 2024, Vermont had 17,100 plug-in vehicles registered — 10,200 fully battery-electric (60%) and 6,900 plug-in hybrid (40%). That ranks Vermont #37 nationally and represents about 0.3% of all US plug-in registrations.

Across 1,192 publicly-listed ports in Vermont (787 Level 2 and 405 DC fast), that works out to roughly 14.3 EVs per public port and 25.2 BEVs per DC fast port.

Vermont has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Vermont drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Vermont market data →

More charging in Saint Albans City

See all →

HANDYCARS STATION 4483

Saint Albans City, VT

Level 2ChargePoint Network
1 station · 1 port7.2 kW

HANDYCARS STATION 6632

Saint Albans City, VT

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging