SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsVermontKillington
VT-276516

KILLINGTON PICO SKI RESORT

228 E Mountain Rd, Killington, VT, 05751

KILLINGTON PICO SKI RESORT is an EV charging location in Killington, VT with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2014
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • Killington Grand Hotel lower parking lot first 2 parking stalls on the left

    Source · NREL

Stations & ports

1 station · 2 ports
KILLINGTON PICO SKI RESORT · L2 J1772 6.5 kW
ChargePoint Network
AC L2 · 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 6.5 kW
1BJ1772· 6.5 kW

Estimated charging time

Level 2 (AC) · 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

228 E Mountain Rd · Killington, VT · 05751

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is KILLINGTON PICO SKI RESORT located?
KILLINGTON PICO SKI RESORT is located at 228 E Mountain Rd, Killington, VT.
What kind of charging does KILLINGTON PICO SKI RESORT offer?
KILLINGTON PICO SKI RESORT offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at KILLINGTON PICO SKI RESORT?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at KILLINGTON PICO SKI RESORT. Actual times vary with vehicle, temperature, and station load.
What are KILLINGTON PICO SKI RESORT's charging hours?
24 hours daily
What charging network operates KILLINGTON PICO SKI RESORT?
KILLINGTON PICO SKI RESORT is part of the ChargePoint network. See more ChargePoint charging across VT on SpotCharge.
Can anyone use the chargers at KILLINGTON PICO SKI RESORT?
Yes — KILLINGTON PICO SKI RESORT is a publicly accessible charging location.
Is the KILLINGTON PICO SKI RESORT listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Vermont · 2024
Plug-in vehicles
17K
#37 in US
Battery-electric
10K
60% of fleet
EVs per public port
12.3
1,385 ports listed

As of 2024, Vermont had 17,100 plug-in vehicles registered — 10,200 fully battery-electric (60%) and 6,900 plug-in hybrid (40%). That ranks Vermont #37 nationally and represents about 0.3% of all US plug-in registrations.

Across 1,385 publicly-listed ports in Vermont (914 Level 2 and 471 DC fast), that works out to roughly 12.3 EVs per public port and 21.7 BEVs per DC fast port.

Vermont has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Vermont drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Vermont market data →

More charging in Killington

See all →

Killington Resort - Snowshed - Tesla Destination

Killington, VT

Level 2Tesla Destination
2 stations · 36 ports

Killington Resort - Golf Course - Tesla Destination

Killington, VT

Level 2Tesla Destination
2 stations · 6 ports

Fall Line - Tesla Destination

Killington, VT

Level 2Tesla Destination
2 stations · 4 ports

Killington Resort - Bear Mountain - Tesla Destination

Killington, VT

Level 2Tesla Destination
2 stations · 12 ports
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 5 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id63550
zip05751
cityKillington
plus4—
stateVT
ng_psi—
cng_psi—
countryUS
latitude43.627083
bd_blends—
longitude-72.79483
open_date2014-10-01
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-15T00:56:33Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameKILLINGTON PICO SKI RESORT
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "30733231",
    "30733241"
  ],
  "station": [
    "USCPIL96503"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address228 E Mountain Rd
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-15
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsKillington Grand Hotel lower parking lot first 2 parking stalls on the left
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging