SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsVermontNorth Springfield
VT-260594

Springfield District

34 Precision drive, North Springfield, VT, 5150

Springfield District is an EV charging location in North Springfield, VT with 2 DC fast charging ports up to 100 kW on the Vialynk network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
100 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

2 stations · 2 ports
Springfield District · DCFC CCS 100 kW
VIALYNK
DC fast · 100 kW

100 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on VIALYNK network →
1ACCS· 100 kW
Springfield District · DCFC CHAdeMO 100 kW
VIALYNK
DC fast · 100 kW

100 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on VIALYNK network →
2ACHAdeMO· 100 kW

Estimated charging time

DC fast charging · 100 kW
~35 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

34 Precision drive · North Springfield, VT · 5150

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Springfield District located?
Springfield District is located at 34 Precision drive, North Springfield, VT.
What kind of charging does Springfield District offer?
Springfield District offers DC fast charging, with stations rated up to 100 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at Springfield District?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 35 min on 100 kW DC fast charging at Springfield District. Actual times vary with vehicle, temperature, and station load.
What are Springfield District's charging hours?
24 hours daily
What charging network operates Springfield District?
Springfield District is part of the Vialynk network. See more Vialynk charging across VT on SpotCharge.
Can anyone use the chargers at Springfield District?
Yes — Springfield District is a publicly accessible charging location.
Is the Springfield District listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Vermont · 2024
Plug-in vehicles
17K
#37 in US
Battery-electric
10K
60% of fleet
EVs per public port
12.3
1,385 ports listed

As of 2024, Vermont had 17,100 plug-in vehicles registered — 10,200 fully battery-electric (60%) and 6,900 plug-in hybrid (40%). That ranks Vermont #37 nationally and represents about 0.3% of all US plug-in registrations.

Across 1,385 publicly-listed ports in Vermont (914 Level 2 and 471 DC fast), that works out to roughly 12.3 EVs per public port and 21.7 BEVs per DC fast port.

Vermont has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Vermont drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Vermont market data →

More DC fast charging

DC fast charging in North Springfield →DC fast charging in Vermont →Vialynk in Vermont →

More charging in North Springfield

See all →

Springfield Cadillac

North Springfield, VT

DC FastEV Connect
1 station · 1 port50 kW

Green Mountain Power

North Springfield, VT

DC FastEnel X
2 stations · 2 ports100 kW
Details
Hours
24 hours daily
Phone
833-611-5965
Network
Vialynk ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id334453
zip5150
cityNorth Springfield
plus4—
stateVT
ng_psi—
cng_psi—
countryUS
latitude43.32949
bd_blends—
longitude-72.53726
open_date2024-05-02
rd_blends—
ev_networkVIALYNK
ev_pricing—
updated_at2026-09-18T05:17:22Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameSpringfield District
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone833-611-5965
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "ev_04721e22733df1560ea8dcccbac4130f",
    "ev_50846d1cc359b229fc70f033c769530a"
  ],
  "station": [
    "loc_9a9cbeefd2f740cb90358831e2c22018"
  ]
}
ev_network_webhttps://www.lynkwell.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address34 Precision drive
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "VIALYNK",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 100,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "VIALYNK",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 100,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging