SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsVermontBellows Falls
VT-141269

Bellows Falls Information Center

17 Depot Rd, Bellows Falls, VT, 05101
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
Max power
50 kW
DC fast
Ports
4
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

3 stations · 4 ports
Bellows Falls Information Center · L2 J1772
RED_E
AC L2 · 7.2 kW
Start session on RED_E network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
Bellows Falls Information Center · DCFC CCS
RED_E
DC fast · 50 kW
Start session on RED_E network →
2ACCS· 50 kW· 480V/100A
Bellows Falls Information Center · DCFC CHAdeMO
RED_E
DC fast · 50 kW
Start session on RED_E network →
3ACHAdeMO· 50 kW· 480V/100A

Estimated charging time

DC fast charging · 50 kW
~1 h 10 min
Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

17 Depot Rd · Bellows Falls, VT · 05101

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Bellows Falls Information Center located?
Bellows Falls Information Center is located at 17 Depot Rd, Bellows Falls, VT.
What kind of charging does Bellows Falls Information Center offer?
Bellows Falls Information Center offers DC fast charging and Level 2 (AC) charging, with stations rated up to 50 kW. There are 3 charging stations and 4 total ports at this location.
How long does it take to charge an EV at Bellows Falls Information Center?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 1 h 10 min on 50 kW DC fast charging, or about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Bellows Falls Information Center. Actual times vary with vehicle, temperature, and station load.
What are Bellows Falls Information Center's charging hours?
Open 24 hours
What charging network operates Bellows Falls Information Center?
Bellows Falls Information Center is part of the RED_E network. See more RED_E charging across VT on SpotCharge.
Can anyone use the chargers at Bellows Falls Information Center?
Yes — Bellows Falls Information Center is a publicly accessible charging location.
Is the Bellows Falls Information Center listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Vermont · 2024
Plug-in vehicles
17K
#37 in US
Battery-electric
10K
60% of fleet
EVs per public port
14.3
1,192 ports listed

As of 2024, Vermont had 17,100 plug-in vehicles registered — 10,200 fully battery-electric (60%) and 6,900 plug-in hybrid (40%). That ranks Vermont #37 nationally and represents about 0.3% of all US plug-in registrations.

Across 1,192 publicly-listed ports in Vermont (787 Level 2 and 405 DC fast), that works out to roughly 14.3 EVs per public port and 25.2 BEVs per DC fast port.

Vermont has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Vermont drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Vermont market data →

Details
Hours
Open 24 hours
Phone
313-262-6722
Network
RED_E ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging