SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsVirginiaNewport News
VA-929564

Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59

4101 Washington Ave, Newport News, VA, 23607
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
Max power
1.4 kW
AC Level 2
Ports
30
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 30 ports
Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59 · L1 J1772
Non-Networked
AC L2 · 1.4 kW
1AJ1772· 1.4 kW· 120V/12A
1BJ1772· 1.4 kW· 120V/12A
1CJ1772· 1.4 kW· 120V/12A
1DJ1772· 1.4 kW· 120V/12A
1EJ1772· 1.4 kW· 120V/12A
1FJ1772· 1.4 kW· 120V/12A
1GJ1772· 1.4 kW· 120V/12A
1HJ1772· 1.4 kW· 120V/12A
1IJ1772· 1.4 kW· 120V/12A
1JJ1772· 1.4 kW· 120V/12A
1KJ1772· 1.4 kW· 120V/12A
1LJ1772· 1.4 kW· 120V/12A
1MJ1772· 1.4 kW· 120V/12A
1NJ1772· 1.4 kW· 120V/12A
1OJ1772· 1.4 kW· 120V/12A
1PJ1772· 1.4 kW· 120V/12A
1QJ1772· 1.4 kW· 120V/12A
1RJ1772· 1.4 kW· 120V/12A
1SJ1772· 1.4 kW· 120V/12A
1TJ1772· 1.4 kW· 120V/12A
1UJ1772· 1.4 kW· 120V/12A
1VJ1772· 1.4 kW· 120V/12A
1WJ1772· 1.4 kW· 120V/12A
1XJ1772· 1.4 kW· 120V/12A
1YJ1772· 1.4 kW· 120V/12A
1ZJ1772· 1.4 kW· 120V/12A
1[J1772· 1.4 kW· 120V/12A
1\J1772· 1.4 kW· 120V/12A
1]J1772· 1.4 kW· 120V/12A
1^J1772· 1.4 kW· 120V/12A

Estimated charging time

Level 2 (AC) · 1.4 kW
~41 h 40 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

4101 Washington Ave · Newport News, VA · 23607

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59 located?
Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59 is located at 4101 Washington Ave, Newport News, VA.
What kind of charging does Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59 offer?
Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59 offers Level 2 (AC) charging, with stations rated up to 1.4 kW. There is 1 charging station and 30 total ports at this location.
How long does it take to charge an EV at Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 41 h 40 min on 1.4 kW Level 2 (AC) charging at Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59. Actual times vary with vehicle, temperature, and station load.
What are Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59's charging hours?
Open 24 hours
What charging network operates Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59?
Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59 is part of the Non-Networked network. See more Non-Networked charging across VA on SpotCharge.
Can anyone use the chargers at Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59?
Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59 is listed as by appointment access — check the details before visiting.
Is the Naval Facilities Engineering Command - Newport News Shipbuilding - Building 59 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Virginia · 2024
Plug-in vehicles
140K
#12 in US
Battery-electric
107K
77% of fleet
EVs per public port
28.4
4,906 ports listed

As of 2024, Virginia had 139,500 plug-in vehicles registered — 107,400 fully battery-electric (77%) and 32,100 plug-in hybrid (23%). That ranks Virginia #12 nationally and represents about 2.3% of all US plug-in registrations.

Across 4,906 publicly-listed ports in Virginia (2,529 Level 2 and 2,368 DC fast), that works out to roughly 28.4 EVs per public port and 45.4 BEVs per DC fast port.

Virginia's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Virginia market data →

More charging in Newport News

See all →

Southern Ford

Newport News, VA

DC FastFORD_CHARGE
1 station · 2 ports50 kW

Wawa - Tesla Supercharger

Newport News, VA

DC FastTesla
1 station · 12 ports50 kW

Wawa - Tesla Supercharger

Newport News, VA

DC FastTesla
1 station · 12 ports50 kW

4EverCharge Station

Newport News, VA

DC FastNon-Networked
1 station · 4 ports50 kW
Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Last updated · 6 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging