SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
Β© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsVirginiaMcLean
VA-836748

FHWA - Turner Fairbanks Highway Research Center

6300 Georgetown Pike, McLean, VA, 22101

FHWA - Turner Fairbanks Highway Research Center is a fed gov in McLean, VA with 1 Level 2 charging port, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Charging is free. By appointment. Listing data from NREL, last confirmed December 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
πŸ“Fed gov
πŸ“…Open since 2021
🚚Fits Light-duty (cars, SUVs)
Max power
β€”
AC Level 2
Ports
1
port
Hours
β€”
Pricing
Free
Free

Stations & ports

1 station Β· 1 port
FHWA - Turner Fairbanks Highway Research Center Β· L1 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772

Estimated charging time

Level 2 (AC) Β· typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV β†’

6300 Georgetown Pike Β· McLean, VA Β· 22101

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet β€” be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is FHWA - Turner Fairbanks Highway Research Center located?
FHWA - Turner Fairbanks Highway Research Center is located at 6300 Georgetown Pike, McLean, VA.
What kind of charging does FHWA - Turner Fairbanks Highway Research Center offer?
FHWA - Turner Fairbanks Highway Research Center offers Level 2 (AC) charging. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at FHWA - Turner Fairbanks Highway Research Center?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at FHWA - Turner Fairbanks Highway Research Center. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at FHWA - Turner Fairbanks Highway Research Center?
Free
Can anyone use the chargers at FHWA - Turner Fairbanks Highway Research Center?
FHWA - Turner Fairbanks Highway Research Center is listed as by appointment access (Government use only) β€” check the details before visiting. NREL lists it as workplace charging, mainly for employees.
Is the FHWA - Turner Fairbanks Highway Research Center listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Virginia Β· 2024
Plug-in vehicles
140K
#12 in US
Battery-electric
107K
77% of fleet
EVs per public port
26.1
5,349 ports listed

As of 2024, Virginia had 139,500 plug-in vehicles registered β€” 107,400 fully battery-electric (77%) and 32,100 plug-in hybrid (23%). That ranks Virginia #12 nationally and represents about 2.3% of all US plug-in registrations.

Across 5,349 publicly-listed ports in Virginia (2,804 Level 2 and 2,534 DC fast), that works out to roughly 26.1 EVs per public port and 42.4 BEVs per DC fast port.

Virginia's public charging is keeping pace with adoption β€” but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) Β· See full Virginia market data β†’

More charging in McLean

See all β†’

Booz Allen - McLean

McLean, VA

Level 2Blink
1 station Β· 3 ports6.2 kW

WASO: USPP US Park Police D2 Station

McLean, VA

Level 2
1 station Β· 2 ports

6707 OLD DOMINI UNIT 13

McLean, VA

Level 2ChargePoint
1 station Β· 1 port9.6 kW

LOWELL STATIONS UNIT 2

McLean, VA

Level 2ChargePoint
1 station Β· 1 port9.6 kW
Details
Pricing
Free
Network
Non-networked
Access
By appointment Β· Government use only
Workplace charging, mainly for employees Β· From NREL
Ownership
Federal government
From NREL

Verified by NREL Β· 9 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fieldsβ–Ύ

From U.S. DOE AFDC Β· Public domain

id184649
zip22101
cityMcLean
plus4β€”
stateVA
ng_psiβ€”
cng_psiβ€”
countryUS
latitude38.946159
bd_blendsβ€”
longitude-77.157015
open_date2021-01-15
rd_blendsβ€”
ev_networkNon-Networked
ev_pricingFree
updated_at2026-02-02T23:16:24Z
access_codeprivate
cng_has_rngβ€”
lng_has_rngβ€”
lpg_primaryβ€”
status_codeE
bd_blends_frβ€”
hy_is_retailβ€”
hy_pressuresβ€”
hy_standardsβ€”
rd_blends_frβ€”
station_nameFHWA - Turner Fairbanks Highway Research Center
ev_other_evseβ€”
ev_pricing_frβ€”
expected_dateβ€”
facility_typeFED_GOV
nps_unit_nameβ€”
station_phoneβ€”
cards_acceptedβ€”
ev_dc_fast_numβ€”
ev_network_webβ€”
federal_agency
{
  "id": 17,
  "code": "DOT",
  "name": "Department of Transportation"
}
fuel_type_codeELEC
geocode_statusGPS
hy_status_linkβ€”
street_address6300 Georgetown Pike
funding_sourcesβ€”
owner_type_codeFG
access_days_timeDrivers must bring their own J1772 cordset for Level 1 charging
e85_blender_pumpβ€”
lpg_nozzle_typesβ€”
ng_vehicle_classβ€”
related_stationsβ€”
cng_dispenser_numβ€”
cng_total_storageβ€”
cng_vehicle_classβ€”
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 1
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "1",
    "funding_sources": []
  }
]
lng_vehicle_classβ€”
ng_fill_type_codeβ€”
restricted_accessβ€”
access_detail_codeGOVERNMENT
cng_fill_type_codeβ€”
ev_connector_typesNEMA515
ev_level1_evse_num1
ev_level2_evse_numβ€”
access_days_time_frβ€”
date_last_confirmed2025-12-12
ev_renewable_sourceβ€”
cng_renewable_sourceβ€”
lng_renewable_sourceβ€”
cng_total_compressionβ€”
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_levelβ€”
groups_with_access_codePrivate - Government only
intersection_directionsβ€”
e85_other_ethanol_blendsβ€”
rd_blended_with_biodieselβ€”
groups_with_access_code_frPrivΓ© - RΓ©servΓ© au gouvernement
intersection_directions_frβ€”
SpotCharge Β· Owner-listed EV charging