SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsVirginiaDanville
VA-455815

Robert Woodall Nissan

132 Union St Bridge Rd, Danville, VA, 24540

Robert Woodall Nissan is a car dealer in Danville, VA with 1 Level 2 charging port, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Charging is free. By appointment. Listing data from NREL, last confirmed January 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🚗Car dealer
📅Open since 2012
Max power
—
AC Level 2
Ports
1
port
Hours
—
Pricing
Free
Free

Stations & ports

1 station · 1 port
Robert Woodall Nissan · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

132 Union St Bridge Rd · Danville, VA · 24540

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Robert Woodall Nissan located?
Robert Woodall Nissan is located at 132 Union St Bridge Rd, Danville, VA.
What kind of charging does Robert Woodall Nissan offer?
Robert Woodall Nissan offers Level 2 (AC) charging. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at Robert Woodall Nissan?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Robert Woodall Nissan. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Robert Woodall Nissan?
Free
Can anyone use the chargers at Robert Woodall Nissan?
Robert Woodall Nissan is listed as by appointment access — check the details before visiting.
Is the Robert Woodall Nissan listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Virginia · 2024
Plug-in vehicles
140K
#12 in US
Battery-electric
107K
77% of fleet
EVs per public port
26.1
5,349 ports listed

As of 2024, Virginia had 139,500 plug-in vehicles registered — 107,400 fully battery-electric (77%) and 32,100 plug-in hybrid (23%). That ranks Virginia #12 nationally and represents about 2.3% of all US plug-in registrations.

Across 5,349 publicly-listed ports in Virginia (2,804 Level 2 and 2,534 DC fast), that works out to roughly 26.1 EVs per public port and 42.4 BEVs per DC fast port.

Virginia's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Virginia market data →

More charging in Danville

See all →

BWH-City Express - Tesla Destination

Danville, VA

Level 2Tesla Destination
2 stations · 4 ports

RMC HAMPTON EV2

Danville, VA

Level 2ChargePoint
1 station · 1 port7.7 kW

Piggly Wiggly - Tesla Supercharger

Danville, VA

DC FastTesla
1 station · 8 ports

The Laurel Hotel

Danville, VA

Level 2ChargeLab
1 station · 1 port11 kW
Details
Pricing
Free
Phone
434-797-1411
Network
Non-networked
Access
By appointment
Ownership
Privately owned
From NREL

Verified by NREL · 8 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id47554
zip24540
cityDanville
plus4—
stateVA
ng_psi—
cng_psi—
countryUS
latitude36.595754
bd_blends—
longitude-79.397091
open_date2012-01-31
rd_blends—
ev_networkNon-Networked
ev_pricingFree
updated_at2026-02-02T23:16:24Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameRobert Woodall Nissan
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeCAR_DEALER
nps_unit_name—
station_phone434-797-1411
cards_accepted—
ev_dc_fast_num—
ev_network_web—
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address132 Union St Bridge Rd
funding_sources—
owner_type_codeP
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2026-01-13
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePrivate
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé
intersection_directions_fr—
SpotCharge · Owner-listed EV charging