SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsVirginiaNorth Chesterfield
VA-341112

WHITTEN CJDR POWER LINK 1

10701 Midlothian Turnpike, North Chesterfield, VA, 23235

WHITTEN CJDR POWER LINK 1 is an EV charging location in North Chesterfield, VA with 2 DC fast charging ports up to 120 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
120 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 2 ports
WHITTEN CJDR POWER LINK 1 · DCFC CCS 120 kW
ChargePoint Network
DC fast · 120 kW

120 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACCS· 120 kW
1BCCS· 120 kW

Estimated charging time

DC fast charging · 120 kW
~29 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

10701 Midlothian Turnpike · North Chesterfield, VA · 23235

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is WHITTEN CJDR POWER LINK 1 located?
WHITTEN CJDR POWER LINK 1 is located at 10701 Midlothian Turnpike, North Chesterfield, VA.
What kind of charging does WHITTEN CJDR POWER LINK 1 offer?
WHITTEN CJDR POWER LINK 1 offers DC fast charging, with stations rated up to 120 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at WHITTEN CJDR POWER LINK 1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 29 min on 120 kW DC fast charging at WHITTEN CJDR POWER LINK 1. Actual times vary with vehicle, temperature, and station load.
What are WHITTEN CJDR POWER LINK 1's charging hours?
24 hours daily
What charging network operates WHITTEN CJDR POWER LINK 1?
WHITTEN CJDR POWER LINK 1 is part of the ChargePoint network. See more ChargePoint charging across VA on SpotCharge.
Can anyone use the chargers at WHITTEN CJDR POWER LINK 1?
Yes — WHITTEN CJDR POWER LINK 1 is a publicly accessible charging location.
Is the WHITTEN CJDR POWER LINK 1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Virginia · 2024
Plug-in vehicles
140K
#12 in US
Battery-electric
107K
77% of fleet
EVs per public port
26.1
5,351 ports listed

As of 2024, Virginia had 139,500 plug-in vehicles registered — 107,400 fully battery-electric (77%) and 32,100 plug-in hybrid (23%). That ranks Virginia #12 nationally and represents about 2.3% of all US plug-in registrations.

Across 5,351 publicly-listed ports in Virginia (2,806 Level 2 and 2,534 DC fast), that works out to roughly 26.1 EVs per public port and 42.4 BEVs per DC fast port.

Virginia's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Virginia market data →

More DC fast charging

DC fast charging in North Chesterfield →DC fast charging in Virginia →ChargePoint in Virginia →

More charging in North Chesterfield

See all →

ROBIOUS BLUE RIDGE BANK

North Chesterfield, VA

Level 2ChargePoint
1 station · 2 ports

Johnston Willis Hospital - Tesla Destination

North Chesterfield, VA

Level 2Tesla Destination
1 station · 4 ports
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 3 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id350752
zip23235
cityNorth Chesterfield
plus4—
stateVA
ng_psi—
cng_psi—
countryUS
latitude37.505726
bd_blends—
longitude-77.594299
open_date2024-07-19
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:39:55Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameWHITTEN CJDR POWER LINK 1
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num2
ev_network_ids
{
  "posts": [
    "25238221",
    "25238231"
  ],
  "station": [
    "USCPIL15648851"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address10701 Midlothian Turnpike
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 120,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 120,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging