SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsUtahPleasant Grove
UT-346945

SJPI SJPI VG3 #1

1333 Valley Grove Way, Pleasant Grove, UT, 84062
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
SJPI SJPI VG3 #1 · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1333 Valley Grove Way · Pleasant Grove, UT · 84062

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is SJPI SJPI VG3 #1 located?
SJPI SJPI VG3 #1 is located at 1333 Valley Grove Way, Pleasant Grove, UT.
What kind of charging does SJPI SJPI VG3 #1 offer?
SJPI SJPI VG3 #1 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at SJPI SJPI VG3 #1?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at SJPI SJPI VG3 #1. Actual times vary with vehicle, temperature, and station load.
What are SJPI SJPI VG3 #1's charging hours?
Open 24 hours
What charging network operates SJPI SJPI VG3 #1?
SJPI SJPI VG3 #1 is part of the ChargePoint Network network. See more ChargePoint Network charging across UT on SpotCharge.
Can anyone use the chargers at SJPI SJPI VG3 #1?
Yes — SJPI SJPI VG3 #1 is a publicly accessible charging location.
Is the SJPI SJPI VG3 #1 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Utah · 2024
Plug-in vehicles
68K
#20 in US
Battery-electric
52K
77% of fleet
EVs per public port
20.1
3,366 ports listed

As of 2024, Utah had 67,700 plug-in vehicles registered — 52,200 fully battery-electric (77%) and 15,500 plug-in hybrid (23%). That ranks Utah #20 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,366 publicly-listed ports in Utah (1,979 Level 2 and 1,385 DC fast), that works out to roughly 20.1 EVs per public port and 37.7 BEVs per DC fast port.

Utah's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Utah market data →

More charging in Pleasant Grove

See all →

Urban Groves

Pleasant Grove, UT

Level 2Blink Network
1 station · 6 ports7.2 kW

SJPI VGI #2

Pleasant Grove, UT

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

TribeHourse

Pleasant Grove, UT

Level 2ChargePoint
1 station · 6 ports6.6 kW

Valley Grove Tower

Pleasant Grove, UT

Level 2(Unknown Operator)
1 station · 4 ports6.6 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging