SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsUtahHill AFB
UT-023044

Hill AFB Building 1513

Community Ln, Hill AFB, UT, 84056

Hill AFB Building 1513 is a fed gov in Hill AFB, UT with 1 Level 2 charging port, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. By appointment. Listing data from NREL, last confirmed December 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
📅Open since 2025
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
1
port
Hours
—
Pricing
—

Stations & ports

1 station · 1 port
Hill AFB Building 1513 · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

Community Ln · Hill AFB, UT · 84056

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Hill AFB Building 1513 located?
Hill AFB Building 1513 is located at Community Ln, Hill AFB, UT.
What kind of charging does Hill AFB Building 1513 offer?
Hill AFB Building 1513 offers Level 2 (AC) charging. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at Hill AFB Building 1513?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Hill AFB Building 1513. Actual times vary with vehicle, temperature, and station load.
Can anyone use the chargers at Hill AFB Building 1513?
Hill AFB Building 1513 is listed as by appointment access (Government use only) — check the details before visiting. NREL lists it as workplace charging, mainly for employees.
Is the Hill AFB Building 1513 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Utah · 2024
Plug-in vehicles
68K
#20 in US
Battery-electric
52K
77% of fleet
EVs per public port
18.3
3,694 ports listed

As of 2024, Utah had 67,700 plug-in vehicles registered — 52,200 fully battery-electric (77%) and 15,500 plug-in hybrid (23%). That ranks Utah #20 nationally and represents about 1.1% of all US plug-in registrations.

Across 3,694 publicly-listed ports in Utah (2,115 Level 2 and 1,577 DC fast), that works out to roughly 18.3 EVs per public port and 33.1 BEVs per DC fast port.

Utah has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Utah drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Utah market data →

More charging in Hill AFB

See all →

Hill AFB

Hill AFB, UT

Level 2
1 station · 5 ports

Hill AFB

Hill AFB, UT

Level 2
2 stations · 2 ports

Hill AFB

Hill AFB, UT

Level 2
2 stations · 2 ports

Hill AFB

Hill AFB, UT

Level 2
2 stations · 2 ports
Details
Network
Non-networked
Access
By appointment · Government use only
Workplace charging, mainly for employees · From NREL
Ownership
Federal government
From NREL

Verified by NREL · 11 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id445336
zip84056
cityHill AFB
plus4—
stateUT
ng_psi—
cng_psi—
countryUS
latitude41.10968
bd_blends—
longitude-111.982698
open_date2025-08-05
rd_blends—
ev_networkNon-Networked
ev_pricing—
updated_at2026-02-02T23:16:24Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameHill AFB Building 1513
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeFED_GOV
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_web—
federal_agency
{
  "id": 5,
  "code": "DAF",
  "name": "Department of Air Force"
}
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_addressCommunity Ln
funding_sources—
owner_type_codeFG
access_days_time—
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 1
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_codeGOVERNMENT
cng_fill_type_code—
ev_connector_typesNEMA1450
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2025-12-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate - Government only
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé - Réservé au gouvernement
intersection_directions_fr—
SpotCharge · Owner-listed EV charging