SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsTexasHouston
TX-706937

DHI TELECOM WEST SIDE

9225 Park S View, Houston, TX, 77051

DHI TELECOM WEST SIDE is an EV charging location in Houston, TX with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed October 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2019
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • In front of main entrance

    Source · NREL

Stations & ports

1 station · 2 ports
DHI TELECOM WEST SIDE · L2 J1772 6.5 kW
ChargePoint Network
AC L2 · 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 6.5 kW
1BJ1772· 6.5 kW

Estimated charging time

Level 2 (AC) · 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

9225 Park S View · Houston, TX · 77051

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is DHI TELECOM WEST SIDE located?
DHI TELECOM WEST SIDE is located at 9225 Park S View, Houston, TX.
What kind of charging does DHI TELECOM WEST SIDE offer?
DHI TELECOM WEST SIDE offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at DHI TELECOM WEST SIDE?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at DHI TELECOM WEST SIDE. Actual times vary with vehicle, temperature, and station load.
What are DHI TELECOM WEST SIDE's charging hours?
24 hours daily
What charging network operates DHI TELECOM WEST SIDE?
DHI TELECOM WEST SIDE is part of the ChargePoint network. See more ChargePoint charging across TX on SpotCharge.
Can anyone use the chargers at DHI TELECOM WEST SIDE?
Yes — DHI TELECOM WEST SIDE is a publicly accessible charging location.
Is the DHI TELECOM WEST SIDE listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Texas · 2024
Plug-in vehicles
359K
#3 in US
Battery-electric
295K
82% of fleet
EVs per public port
25.3
14,217 ports listed

As of 2024, Texas had 359,400 plug-in vehicles registered — 294,700 fully battery-electric (82%) and 64,700 plug-in hybrid (18%). That ranks Texas #3 nationally and represents about 6.0% of all US plug-in registrations.

Across 14,217 publicly-listed ports in Texas (6,509 Level 2 and 7,698 DC fast), that works out to roughly 25.3 EVs per public port and 38.3 BEVs per DC fast port.

Texas's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Texas market data →

More charging in Houston

See all →

Brays Oak Crossing - Tesla Supercharger

Houston, TX

DC FastTesla
1 station · 24 ports325 kW

3939 Southwest Fwy

Houston, TX

DC FastShell Recharge
2 stations · 8 ports400 kW

SUPERBAB BUBBA CHARGER 2

Houston, TX

Level 2ChargePoint
2 stations · 2 ports9.6 kW

JW MARRIOTT CHARGER 1

Houston, TX

Level 2ChargePoint
2 stations · 4 ports9.6 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 1 week ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center76 fields▾

From U.S. DOE AFDC · Public domain

id144976
zip77051
cityHouston
plus4—
stateTX
ng_psi—
cng_psi—
countryUS
latitude29.651665
bd_blends—
longitude-95.382691
open_date2019-09-05
rd_blends—
ev_networkChargePoint Network
ev_pricing—
unverifiedNo
updated_at2026-10-28T02:58:35Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameDHI TELECOM WEST SIDE
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "2170021",
    "2170031"
  ],
  "station": [
    "USCPIL1845931"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address9225 Park S View
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-10-28
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsIn front of main entrance
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging