SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsTexasDallas
TX-706470

Oncor Electric Utility Mountain Creek

2233 Mountain Creek Pkwy, Dallas, TX, 75211

Oncor Electric Utility Mountain Creek is a parking lot in Dallas, TX with 2 Level 2 charging ports up to 12 kW on the Revitalize network. Charging is free. By appointment. Listing data from NREL, last confirmed October 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🅿️Parking lot
📅Open since 2025
🚚Fits Light-duty (cars, SUVs)
Max power
12 kW
AC Level 2
Ports
2
ports
Hours
—
Pricing
Free
Free

Stations & ports

1 station · 2 ports
Oncor Electric Utility Mountain Creek · L2 J1772 12 kW
REVITALIZE
AC L2 · 12 kW

12 kW adds roughly 40 miles of range per hour for a typical EV.

Start session on REVITALIZE network →
1AJ1772· 12 kW
1BJ1772· 12 kW

Estimated charging time

Level 2 (AC) · 11 kW
Limited by a typical EV's onboard charger
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

2233 Mountain Creek Pkwy · Dallas, TX · 75211

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Oncor Electric Utility Mountain Creek located?
Oncor Electric Utility Mountain Creek is located at 2233 Mountain Creek Pkwy, Dallas, TX.
What kind of charging does Oncor Electric Utility Mountain Creek offer?
Oncor Electric Utility Mountain Creek offers Level 2 (AC) charging, with stations rated up to 12 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Oncor Electric Utility Mountain Creek?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at Oncor Electric Utility Mountain Creek. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at Oncor Electric Utility Mountain Creek?
Free
What charging network operates Oncor Electric Utility Mountain Creek?
Oncor Electric Utility Mountain Creek is part of the Revitalize network. See more Revitalize charging across TX on SpotCharge.
Can anyone use the chargers at Oncor Electric Utility Mountain Creek?
Oncor Electric Utility Mountain Creek is listed as by appointment access — check the details before visiting. NREL lists it as workplace charging, mainly for employees.
How do you pay for charging at Oncor Electric Utility Mountain Creek?
Oncor Electric Utility Mountain Creek accepts Network account balance, according to NREL.
Is the Oncor Electric Utility Mountain Creek listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Texas · 2024
Plug-in vehicles
359K
#3 in US
Battery-electric
295K
82% of fleet
EVs per public port
26
13,836 ports listed

As of 2024, Texas had 359,400 plug-in vehicles registered — 294,700 fully battery-electric (82%) and 64,700 plug-in hybrid (18%). That ranks Texas #3 nationally and represents about 6.0% of all US plug-in registrations.

Across 13,836 publicly-listed ports in Texas (6,396 Level 2 and 7,430 DC fast), that works out to roughly 26 EVs per public port and 39.7 BEVs per DC fast port.

Texas's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Texas market data →

More charging in Dallas

See all →

TA Bonnie View Road, Dallas, TX

Dallas, TX

DC Fastbp pulse
2 stations · 12 ports400 kW

Dallas, TX - Cole Avenue - Tesla Destination

Dallas, TX

Level 2Tesla Destination
2 stations · 8 ports10 kW

Axis at Wycliff

Dallas, TX

Level 2LOOP
1 station · 5 ports7.7 kW

PLATINUM PARK MO OT LEFT

Dallas, TX

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Pricing
Free
Network
Revitalize ↗
Access
By appointment
Workplace charging, mainly for employees · From NREL
Payment
Network account balance
From NREL
Ownership
Privately owned
From NREL

Verified by NREL · 11 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id421683
zip75211
cityDallas
plus4—
stateTX
ng_psi—
cng_psi—
countryUS
latitude32.7240549
bd_blends—
longitude-96.9353515
open_date2025-01-12
rd_blends—
ev_networkREVITALIZE
ev_pricingFree
updated_at2026-02-02T23:16:24Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameOncor Electric Utility Mountain Creek
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typePARKING_LOT
nps_unit_name—
station_phone—
cards_acceptedACCOUNT_BALANCE
ev_dc_fast_num—
ev_network_webhttps://www.revitalizecs.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address2233 Mountain Creek Pkwy
funding_sources—
owner_type_codeP
access_days_timeAuthorized users only
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "REVITALIZE",
    "connectors": {
      "J1772": {
        "power_kw": 12,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "REVITALIZE",
    "connectors": {
      "J1772": {
        "power_kw": 12,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2025-10-13
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé
intersection_directions_fr—
SpotCharge · Owner-listed EV charging