SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsTexasBeeville
TX-366380

AZTEC EV AZTEC CHEVROLET

772 U.S. 181, Beeville, TX, 78102

AZTEC EV AZTEC CHEVROLET is an EV charging location in Beeville, TX with 2 DC fast charging ports up to 63 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2024
Max power
62.5 kW
DC fast
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • AZTEC CHEVROLET GMC SOUTH LOT

    Source · NREL

Stations & ports

2 stations · 2 ports
AZTEC EV AZTEC CHEVROLET · DCFC CHAdeMO 62.5 kW
ChargePoint Network
DC fast · 62.5 kW

62.5 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
1ACHAdeMO· 62.5 kW
AZTEC EV AZTEC CHEVROLET · DCFC CCS 62 kW
ChargePoint Network
DC fast · 62 kW

62 kW adds roughly 100 miles in 30 to 45 minutes, depending on the car.

Start session on ChargePoint Network network →
2ACCS· 62 kW

Estimated charging time

DC fast charging · 62.5 kW
~56 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

772 U.S. 181 · Beeville, TX · 78102

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is AZTEC EV AZTEC CHEVROLET located?
AZTEC EV AZTEC CHEVROLET is located at 772 U.S. 181, Beeville, TX.
What kind of charging does AZTEC EV AZTEC CHEVROLET offer?
AZTEC EV AZTEC CHEVROLET offers DC fast charging, with stations rated up to 62.5 kW. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at AZTEC EV AZTEC CHEVROLET?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 56 min on 62.5 kW DC fast charging at AZTEC EV AZTEC CHEVROLET. Actual times vary with vehicle, temperature, and station load.
What are AZTEC EV AZTEC CHEVROLET's charging hours?
24 hours daily
What charging network operates AZTEC EV AZTEC CHEVROLET?
AZTEC EV AZTEC CHEVROLET is part of the ChargePoint network. See more ChargePoint charging across TX on SpotCharge.
Can anyone use the chargers at AZTEC EV AZTEC CHEVROLET?
Yes — AZTEC EV AZTEC CHEVROLET is a publicly accessible charging location.
Is the AZTEC EV AZTEC CHEVROLET listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Texas · 2024
Plug-in vehicles
359K
#3 in US
Battery-electric
295K
82% of fleet
EVs per public port
26
13,836 ports listed

As of 2024, Texas had 359,400 plug-in vehicles registered — 294,700 fully battery-electric (82%) and 64,700 plug-in hybrid (18%). That ranks Texas #3 nationally and represents about 6.0% of all US plug-in registrations.

Across 13,836 publicly-listed ports in Texas (6,396 Level 2 and 7,430 DC fast), that works out to roughly 26 EVs per public port and 39.7 BEVs per DC fast port.

Texas's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Texas market data →

More DC fast charging

DC fast charging in Beeville →DC fast charging in Texas →ChargePoint in Texas →

More charging in Beeville

See all →

Sky Palace Inn & Suites by Jasper Beeville

Beeville, TX

Level 2Universal EV Chargers
1 station · 4 ports11.2 kW

SureStay Plus Hotel - Western Beeville

Beeville, TX

Level 2Universal EV Chargers
1 station · 2 ports11.2 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id331938
zip78102
cityBeeville
plus4—
stateTX
ng_psi—
cng_psi—
countryUS
latitude28.426186
bd_blends—
longitude-97.737219
open_date2024-04-09
rd_blends—
ev_networkChargePoint Network
ev_pricing—
updated_at2026-09-18T02:39:46Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameAZTEC EV AZTEC CHEVROLET
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num1
ev_network_ids
{
  "posts": [
    "25218531"
  ],
  "station": [
    "USCPIL15631641"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address772 U.S. 181
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 0
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": 62.5,
        "port_count": 1
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": 62,
        "port_count": 1
      }
    },
    "port_count": 1,
    "charging_level": "dc_fast",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesCHADEMO, J1772COMBO
ev_level1_evse_num—
ev_level2_evse_num—
access_days_time_fr—
date_last_confirmed2026-09-18
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsAZTEC CHEVROLET GMC SOUTH LOT
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging