SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsTennesseeSoddy Daisy
TN-692760

Sequoyah Nuclear Plant

Igou Ferry Rd, Soddy Daisy, TN, 37379
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
Max power
7.2 kW
AC Level 2
Ports
12
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 12 ports
Sequoyah Nuclear Plant · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
1EJ1772· 7.2 kW· 240V/30A
1FJ1772· 7.2 kW· 240V/30A
1GJ1772· 7.2 kW· 240V/30A
1HJ1772· 7.2 kW· 240V/30A
1IJ1772· 7.2 kW· 240V/30A
1JJ1772· 7.2 kW· 240V/30A
1KJ1772· 7.2 kW· 240V/30A
1LJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

Igou Ferry Rd · Soddy Daisy, TN · 37379

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Sequoyah Nuclear Plant located?
Sequoyah Nuclear Plant is located at Igou Ferry Rd, Soddy Daisy, TN.
What kind of charging does Sequoyah Nuclear Plant offer?
Sequoyah Nuclear Plant offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 12 total ports at this location.
How long does it take to charge an EV at Sequoyah Nuclear Plant?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Sequoyah Nuclear Plant. Actual times vary with vehicle, temperature, and station load.
What are Sequoyah Nuclear Plant's charging hours?
Open 24 hours
What charging network operates Sequoyah Nuclear Plant?
Sequoyah Nuclear Plant is part of the Non-Networked network. See more Non-Networked charging across TN on SpotCharge.
Can anyone use the chargers at Sequoyah Nuclear Plant?
Sequoyah Nuclear Plant is listed as by appointment access — check the details before visiting.
Is the Sequoyah Nuclear Plant listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Tennessee · 2024
Plug-in vehicles
55K
#24 in US
Battery-electric
43K
77% of fleet
EVs per public port
15.4
3,587 ports listed

As of 2024, Tennessee had 55,400 plug-in vehicles registered — 42,600 fully battery-electric (77%) and 12,800 plug-in hybrid (23%). That ranks Tennessee #24 nationally and represents about 0.9% of all US plug-in registrations.

Across 3,587 publicly-listed ports in Tennessee (1,710 Level 2 and 1,874 DC fast), that works out to roughly 15.4 EVs per public port and 22.7 BEVs per DC fast port.

Tennessee has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Tennessee drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Tennessee market data →

Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Last updated · 6 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging