SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsTennesseeLebanon
TN-549338

Cedars of Lebanon State Park

328 Cedar Forest Road, Lebanon, TN, 37090

Cedars of Lebanon State Park is a public in Lebanon, TN with 2 Level 2 charging ports up to 11 kW on the Rivian Waypoints network. 24 hours daily. Public access. Listing data from NREL, last confirmed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
📅Open since 2023
Max power
11 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 2 ports
Cedars of Lebanon State Park · L2 J1772 11 kW
RIVIAN_WAYPOINTS
AC L2 · 11 kW

11 kW adds roughly 40 miles of range per hour for a typical EV.

Start session on RIVIAN_WAYPOINTS network →
1AJ1772· 11 kW
1BJ1772· 11 kW

Estimated charging time

Level 2 (AC) · 11 kW
~5 h 18 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

328 Cedar Forest Road · Lebanon, TN · 37090

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Cedars of Lebanon State Park located?
Cedars of Lebanon State Park is located at 328 Cedar Forest Road, Lebanon, TN.
What kind of charging does Cedars of Lebanon State Park offer?
Cedars of Lebanon State Park offers Level 2 (AC) charging, with stations rated up to 11 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Cedars of Lebanon State Park?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 5 h 18 min on 11 kW Level 2 (AC) charging at Cedars of Lebanon State Park. Actual times vary with vehicle, temperature, and station load.
What are Cedars of Lebanon State Park's charging hours?
24 hours daily
What charging network operates Cedars of Lebanon State Park?
Cedars of Lebanon State Park is part of the Rivian Waypoints network. See more Rivian Waypoints charging across TN on SpotCharge.
Can anyone use the chargers at Cedars of Lebanon State Park?
Yes — Cedars of Lebanon State Park is a publicly accessible charging location.
How do you pay for charging at Cedars of Lebanon State Park?
Cedars of Lebanon State Park accepts Visa, Mastercard, American Express, Discover and Network account balance, according to NREL.
Is the Cedars of Lebanon State Park listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Tennessee · 2024
Plug-in vehicles
55K
#24 in US
Battery-electric
43K
77% of fleet
EVs per public port
14.7
3,771 ports listed

As of 2024, Tennessee had 55,400 plug-in vehicles registered — 42,600 fully battery-electric (77%) and 12,800 plug-in hybrid (23%). That ranks Tennessee #24 nationally and represents about 0.9% of all US plug-in registrations.

Across 3,771 publicly-listed ports in Tennessee (1,821 Level 2 and 1,947 DC fast), that works out to roughly 14.7 EVs per public port and 21.9 BEVs per DC fast port.

Tennessee has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Tennessee drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Tennessee market data →

More charging in Lebanon

See all →

Pilot Travel Center 411

Lebanon, TN

DC FastEVgo
1 station · 6 ports350 kW

Nissan Collision Center

Lebanon, TN

Level 2
1 station · 2 ports

FEI STATION 3

Lebanon, TN

Level 2ChargePoint
1 station · 2 ports6.5 kW

Hertz Local Edition #17-1500075-1001C - Tesla Destination

Lebanon, TN

Level 2Tesla Destination
1 station · 3 ports
Details
Hours
24 hours daily
Phone
866-576-1495
Network
Rivian Waypoints ↗
Access
Public access
Payment
Visa, Mastercard, American Express, Discover, Network account balance
From NREL

Verified by NREL · 2 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center75 fields▾

From U.S. DOE AFDC · Public domain

id391267
zip37090
cityLebanon
plus4—
stateTN
ng_psi—
cng_psi—
countryUS
latitude36.0851453
bd_blends—
longitude-86.3237321
open_date2023-12-05
rd_blends—
ev_networkRIVIAN_WAYPOINTS
ev_pricing—
updated_at2026-09-19T02:36:13Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCedars of Lebanon State Park
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typePUBLIC
nps_unit_name—
station_phone866-576-1495
cards_acceptedA ACCOUNT_BALANCE D M V
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "W1-1113-SRV7-1-2207-00056",
    "W1-1113-SRV7-1-2210-00047"
  ],
  "station": [
    "US-RIV-L15681342657391121880"
  ]
}
ev_network_webhttps://rivian.com/experience/charging
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address328 Cedar Forest Road
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "RIVIAN_WAYPOINTS",
    "connectors": {
      "J1772": {
        "power_kw": 11,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "RIVIAN_WAYPOINTS",
    "connectors": {
      "J1772": {
        "power_kw": 11,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-09-19
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging