SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsTennesseeGallatin
TN-328029

Gallatin Fossil Plant

1499 Steam Plant Rd, Gallatin, TN, 37066
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Fed gov
Max power
7.2 kW
AC Level 2
Ports
5
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

2 stations · 5 ports
Gallatin Fossil Plant · L2 J1772
Non-Networked
AC L2 · 7.2 kW
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A
1CJ1772· 7.2 kW· 240V/30A
1DJ1772· 7.2 kW· 240V/30A
Gallatin Fossil Plant · L1 J1772
Non-Networked
AC L2 · 1.4 kW
2AJ1772· 1.4 kW· 120V/12A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

1499 Steam Plant Rd · Gallatin, TN · 37066

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Gallatin Fossil Plant located?
Gallatin Fossil Plant is located at 1499 Steam Plant Rd, Gallatin, TN.
What kind of charging does Gallatin Fossil Plant offer?
Gallatin Fossil Plant offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There are 2 charging stations and 5 total ports at this location.
How long does it take to charge an EV at Gallatin Fossil Plant?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Gallatin Fossil Plant. Actual times vary with vehicle, temperature, and station load.
What are Gallatin Fossil Plant's charging hours?
Open 24 hours
What charging network operates Gallatin Fossil Plant?
Gallatin Fossil Plant is part of the Non-Networked network. See more Non-Networked charging across TN on SpotCharge.
Can anyone use the chargers at Gallatin Fossil Plant?
Gallatin Fossil Plant is listed as by appointment access — check the details before visiting.
Is the Gallatin Fossil Plant listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Tennessee · 2024
Plug-in vehicles
55K
#24 in US
Battery-electric
43K
77% of fleet
EVs per public port
15.4
3,587 ports listed

As of 2024, Tennessee had 55,400 plug-in vehicles registered — 42,600 fully battery-electric (77%) and 12,800 plug-in hybrid (23%). That ranks Tennessee #24 nationally and represents about 0.9% of all US plug-in registrations.

Across 3,587 publicly-listed ports in Tennessee (1,710 Level 2 and 1,874 DC fast), that works out to roughly 15.4 EVs per public port and 22.7 BEVs per DC fast port.

Tennessee has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Tennessee drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Tennessee market data →

More charging in Gallatin

See all →

PEMB 233441182070

Gallatin, TN

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

PEMB 225241131911

Gallatin, TN

Level 2ChargePoint Network
1 station · 1 port7.2 kW

Echo Suites Gallatin TN

Gallatin, TN

Level 2LOOP
1 station · 6 ports7.2 kW

Bledsoe Creek State Park

Gallatin, TN

Level 2RIVIAN_WAYPOINTS
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Network
Non-Networked
Access
By appointment

Last updated · 6 months ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging