SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsSouth Dakota
SD-631258

ClipperCreek

Address unavailable, SD

ClipperCreek is an EV charging location in SD with 2 Level 2 charging ports. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Charging is free. Public access. Listing data from OpenStreetMap, last confirmed November 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
—
AC Level 2
Ports
2
ports
Hours
—
Pricing
Free
Free

Stations & ports

2 stations · 2 ports
ClipperCreek · Tesla
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1ATesla
ClipperCreek · J1772
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

2AJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

Address unavailable · SD

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is ClipperCreek located?
ClipperCreek is located at Address unavailable, SD.
What kind of charging does ClipperCreek offer?
ClipperCreek offers Level 2 (AC) charging. There are 2 charging stations and 2 total ports at this location.
How long does it take to charge an EV at ClipperCreek?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at ClipperCreek. Actual times vary with vehicle, temperature, and station load.
How much does it cost to charge at ClipperCreek?
Free
Can anyone use the chargers at ClipperCreek?
Yes — ClipperCreek is a publicly accessible charging location.
Is the ClipperCreek listing owner-managed?
Not yet. This page was generated from open charging data (OpenStreetMap) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

South Dakota · 2024
Plug-in vehicles
4.0K
#49 in US
Battery-electric
2.3K
57% of fleet
EVs per public port
10.3
390 ports listed

As of 2024, South Dakota had 4,000 plug-in vehicles registered — 2,300 fully battery-electric (57%) and 1,700 plug-in hybrid (43%). That ranks South Dakota #49 nationally and represents about 0.1% of all US plug-in registrations.

Across 390 publicly-listed ports in South Dakota (149 Level 2 and 241 DC fast), that works out to roughly 10.3 EVs per public port and 9.5 BEVs per DC fast port.

South Dakota has comparatively strong public charging coverage today. Listing here keeps your stations visible as more South Dakota drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full South Dakota market data →

Details
Pricing
Free
Access
Public access

Synced from OpenStreetMap · 1 day ago

Data from OpenStreetMap (ODbL)

SpotCharge · Owner-listed EV charging