SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsSouth CarolinaBlackville
SC-735057

Barnwell State Park

223 State Park Rd, Blackville, SC, 29817
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📍Public
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
Barnwell State Park · L2 J1772
RIVIAN_WAYPOINTS
AC L2 · 7.2 kW
Start session on RIVIAN_WAYPOINTS network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

223 State Park Rd · Blackville, SC · 29817

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Barnwell State Park located?
Barnwell State Park is located at 223 State Park Rd, Blackville, SC.
What kind of charging does Barnwell State Park offer?
Barnwell State Park offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Barnwell State Park?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at Barnwell State Park. Actual times vary with vehicle, temperature, and station load.
What are Barnwell State Park's charging hours?
Open 24 hours
What charging network operates Barnwell State Park?
Barnwell State Park is part of the RIVIAN_WAYPOINTS network. See more RIVIAN_WAYPOINTS charging across SC on SpotCharge.
Can anyone use the chargers at Barnwell State Park?
Yes — Barnwell State Park is a publicly accessible charging location.
Is the Barnwell State Park listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

South Carolina · 2024
Plug-in vehicles
38K
#29 in US
Battery-electric
27K
71% of fleet
EVs per public port
17.4
2,173 ports listed

As of 2024, South Carolina had 37,900 plug-in vehicles registered — 26,800 fully battery-electric (71%) and 11,100 plug-in hybrid (29%). That ranks South Carolina #29 nationally and represents about 0.6% of all US plug-in registrations.

Across 2,173 publicly-listed ports in South Carolina (968 Level 2 and 1,184 DC fast), that works out to roughly 17.4 EVs per public port and 22.6 BEVs per DC fast port.

South Carolina has comparatively strong public charging coverage today. Listing here keeps your stations visible as more South Carolina drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full South Carolina market data →

Details
Hours
Open 24 hours
Phone
866-576-1495
Network
RIVIAN_WAYPOINTS ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging