SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsSouth CarolinaGreenville
SC-507496

400 N main st

400 N Main St, Greenville, SC, 29601

400 N main st is a multi-unit residence in Greenville, SC with 2 Level 2 charging ports on the AmpUp network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Contact stations for hours of operation. Public access. Listing data from NREL, last confirmed September 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏢Multi-unit residence
📅Open since 2024
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
2
ports
Hours
Hours
Contact stations for hours of operation
Pricing
—

Stations & ports

1 station · 2 ports
400 N main st · L2 J1772
AMPUP
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on AMPUP network →
1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

400 N Main St · Greenville, SC · 29601

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is 400 N main st located?
400 N main st is located at 400 N Main St, Greenville, SC.
What kind of charging does 400 N main st offer?
400 N main st offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at 400 N main st?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at 400 N main st. Actual times vary with vehicle, temperature, and station load.
What are 400 N main st's charging hours?
Contact stations for hours of operation
What charging network operates 400 N main st?
400 N main st is part of the AmpUp network. See more AmpUp charging across SC on SpotCharge.
Can anyone use the chargers at 400 N main st?
Yes — 400 N main st is a publicly accessible charging location.
How do you pay for charging at 400 N main st?
400 N main st accepts Mastercard, American Express, Discover, Apple Pay and Google Pay, according to NREL.
Is the 400 N main st listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

South Carolina · 2024
Plug-in vehicles
38K
#29 in US
Battery-electric
27K
71% of fleet
EVs per public port
14.3
2,644 ports listed

As of 2024, South Carolina had 37,900 plug-in vehicles registered — 26,800 fully battery-electric (71%) and 11,100 plug-in hybrid (29%). That ranks South Carolina #29 nationally and represents about 0.6% of all US plug-in registrations.

Across 2,644 publicly-listed ports in South Carolina (1,313 Level 2 and 1,310 DC fast), that works out to roughly 14.3 EVs per public port and 20.5 BEVs per DC fast port.

South Carolina has comparatively strong public charging coverage today. Listing here keeps your stations visible as more South Carolina drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full South Carolina market data →

More charging in Greenville

See all →

The McClaren - Tesla Destination

Greenville, SC

Level 2Tesla Destination
2 stations · 12 ports8 kW

Greenville, SC Rechargery Relay @ Circle K - E. Butler Rd

Greenville, SC

DC FastIONNA
2 stations · 4 ports400 kW

Cracker Barrel - Tesla Supercharger

Greenville, SC

DC FastTesla
1 station · 16 ports325 kW

Stay-N-Charge EV Charging Station - Home2 Suites by Hilton Greenville Airport

Greenville, SC

Level 2Stay-N-Charge
1 station · 2 ports11.5 kW
Details
Hours
Contact stations for hours of operation
Phone
864-357-5431
Network
AmpUp ↗
Access
Public access
Payment
Mastercard, American Express, Discover, Apple Pay, Google Pay
From NREL
Ownership
Privately owned
From NREL

Verified by NREL · 12 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id421518
zip29601
cityGreenville
plus4—
stateSC
ng_psi—
cng_psi—
countryUS
latitude34.8556585
bd_blends—
longitude-82.3965246
open_date2024-08-20
rd_blends—
ev_networkAMPUP
ev_pricing—
updated_at2026-08-05T18:21:35Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_name400 N main st
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeMULTI_UNIT_DWELLING
nps_unit_name—
station_phone864-357-5431
cards_acceptedA ANDROID_PAY APPLE_PAY CREDIT D M
ev_dc_fast_num—
ev_network_webhttps://ampup.io
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address400 N Main St
funding_sources—
owner_type_codeP
access_days_timeContact stations for hours of operation
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2025-09-12
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging