SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsSouth CarolinaHilton Head Island
SC-028738

Celebration Park

80 Pope Ave, Hilton Head Island, SC, 29928

Celebration Park is a park in Hilton Head Island, SC with 1 Level 2 charging port, not on a charging network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. 24 hours daily. Public access. Listing data from NREL, last confirmed July 2025.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🌳Park
📅Open since 2022
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
1
port
Hours
24/7
24 hours daily
Pricing
—

Stations & ports

1 station · 1 port
Celebration Park · L2 J1772
Non-Networked
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

1AJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

80 Pope Ave · Hilton Head Island, SC · 29928

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Celebration Park located?
Celebration Park is located at 80 Pope Ave, Hilton Head Island, SC.
What kind of charging does Celebration Park offer?
Celebration Park offers Level 2 (AC) charging. There is 1 charging station and 1 total ports at this location.
How long does it take to charge an EV at Celebration Park?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Celebration Park. Actual times vary with vehicle, temperature, and station load.
What are Celebration Park's charging hours?
24 hours daily
Can anyone use the chargers at Celebration Park?
Yes — Celebration Park is a publicly accessible charging location.
Is the Celebration Park listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

South Carolina · 2024
Plug-in vehicles
38K
#29 in US
Battery-electric
27K
71% of fleet
EVs per public port
14.3
2,644 ports listed

As of 2024, South Carolina had 37,900 plug-in vehicles registered — 26,800 fully battery-electric (71%) and 11,100 plug-in hybrid (29%). That ranks South Carolina #29 nationally and represents about 0.6% of all US plug-in registrations.

Across 2,644 publicly-listed ports in South Carolina (1,313 Level 2 and 1,310 DC fast), that works out to roughly 14.3 EVs per public port and 20.5 BEVs per DC fast port.

South Carolina has comparatively strong public charging coverage today. Listing here keeps your stations visible as more South Carolina drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full South Carolina market data →

More charging in Hilton Head Island

See all →

TOWER 1 EV EV

Hilton Head Island, SC

Level 2ChargePoint
1 station · 1 port6.5 kW

STARBUCKS STORE #65239

Hilton Head Island, SC

Level 2ChargePoint
1 station · 2 ports6.5 kW

PDPOA PD PASS OFFICE

Hilton Head Island, SC

Level 2ChargePoint
1 station · 2 ports6.5 kW

Palmetto Electirc Co-op_ Hilton Head Island office

Hilton Head Island, SC

Level 2ZEFNET
1 station · 1 port
Details
Hours
24 hours daily
Phone
843-342-4580
Network
Non-networked
Access
Public access
Ownership
Local or municipal government
From NREL

Verified by NREL · 15 months ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id212762
zip29928
cityHilton Head Island
plus4—
stateSC
ng_psi—
cng_psi—
countryUS
latitude32.14434
bd_blends—
longitude-80.754534
open_date2022-01-28
rd_blends—
ev_networkNon-Networked
ev_pricing—
updated_at2026-02-02T23:16:24Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameCelebration Park
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typePARK
nps_unit_name—
station_phone843-342-4580
cards_accepted—
ev_dc_fast_num—
ev_network_web—
fuel_type_codeELEC
geocode_status200-9
hy_status_link—
street_address80 Pope Ave
funding_sources—
owner_type_codeLG
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "Non-Networked",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num1
access_days_time_fr—
date_last_confirmed2025-07-03
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging