SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsRhode IslandBristol
RI-213172

Mt. Hope Office

3 Ferry Rd, Bristol, RI, 02809

Mt. Hope Office is a office building in Bristol, RI with 2 Level 2 charging ports on the AmpUp network. Charging power is not listed for this location; Level 2 chargers are typically 6 to 11 kW, which adds roughly 20 to 40 miles of range per hour for a typical EV. Contact station for hours of availability. By appointment. Listing data from NREL, last refreshed September 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
🏢Office building
📅Open since 2022
🚚Fits Light-duty (cars, SUVs)
Max power
—
AC Level 2
Ports
2
ports
Hours
Hours
Contact station for hours of availability
Pricing
—

Stations & ports

1 station · 2 ports
Mt. Hope Office · L2 J1772
AMPUP
AC L2

Rating not listed. Level 2 chargers are typically 6 to 11 kW. That adds roughly 20 to 40 miles of range per hour for a typical EV.

Start session on AMPUP network →
1AJ1772
1BJ1772

Estimated charging time

Level 2 (AC) · typical 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

3 Ferry Rd · Bristol, RI · 02809

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is Mt. Hope Office located?
Mt. Hope Office is located at 3 Ferry Rd, Bristol, RI.
What kind of charging does Mt. Hope Office offer?
Mt. Hope Office offers Level 2 (AC) charging. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at Mt. Hope Office?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on a typical 7.2 kW Level 2 (AC) charging at Mt. Hope Office. Actual times vary with vehicle, temperature, and station load.
What are Mt. Hope Office's charging hours?
Contact station for hours of availability
What charging network operates Mt. Hope Office?
Mt. Hope Office is part of the AmpUp network. See more AmpUp charging across RI on SpotCharge.
Can anyone use the chargers at Mt. Hope Office?
Mt. Hope Office is listed as by appointment access — check the details before visiting. NREL lists it as workplace charging, mainly for employees.
Is the Mt. Hope Office listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Rhode Island · 2024
Plug-in vehicles
14K
#42 in US
Battery-electric
8.3K
58% of fleet
EVs per public port
18.7
764 ports listed

As of 2024, Rhode Island had 14,300 plug-in vehicles registered — 8,300 fully battery-electric (58%) and 6,000 plug-in hybrid (42%). That ranks Rhode Island #42 nationally and represents about 0.2% of all US plug-in registrations.

Across 764 publicly-listed ports in Rhode Island (490 Level 2 and 273 DC fast), that works out to roughly 18.7 EVs per public port and 30.4 BEVs per DC fast port.

Rhode Island has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Rhode Island drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Rhode Island market data →

More charging in Bristol

See all →

RI OER RI VETS HOME

Bristol, RI

Level 2ChargePoint
1 station · 2 ports6.5 kW

RI ENERGY ROGER WILLIAMS

Bristol, RI

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Hours
Contact station for hours of availability
Network
AmpUp ↗
Access
By appointment
Workplace charging, mainly for employees · From NREL
Ownership
Privately owned
From NREL

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center74 fields▾

From U.S. DOE AFDC · Public domain

id251561
zip02809
cityBristol
plus4—
stateRI
ng_psi—
cng_psi—
countryUS
latitude41.6482459
bd_blends—
longitude-71.2623593
open_date2022-10-11
rd_blends—
ev_networkAMPUP
ev_pricing—
updated_at2026-08-05T18:21:35Z
access_codeprivate
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameMt. Hope Office
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_typeOFFICE_BLDG
nps_unit_name—
station_phone—
cards_accepted—
ev_dc_fast_num—
ev_network_webhttps://ampup.io
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address3 Ferry Rd
funding_sources—
owner_type_codeP
access_days_timeContact station for hours of availability
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "AMPUP",
    "connectors": {
      "J1772": {
        "power_kw": null,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_access—
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2023-02-13
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingYes
maximum_vehicle_classLD
rd_max_biodiesel_level—
groups_with_access_codePrivate
intersection_directions—
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPrivé
intersection_directions_fr—
SpotCharge · Owner-listed EV charging