SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogReportsDestinationsLinkedInPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsRhode IslandSouth Kingstown
RI-205214

RI OER EAST MATUNUCK

950 Succotash Rd, South Kingstown, RI, 02879

RI OER EAST MATUNUCK is an EV charging location in South Kingstown, RI with 2 Level 2 charging ports up to 7 kW on the ChargePoint network. 24 hours daily. Public access. Listing data from NREL, last confirmed November 2026.

Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
📅Open since 2013
Max power
6.5 kW
AC Level 2
Ports
2
ports
Hours
24/7
24 hours daily
Pricing
—

Finding this location

  • Memorial Day–Labor Day, 8AM–6PM: parking fee for chargers. After 6PM: no fee; vehicles must exit by sunset. Rest of year: no parking fee, gates open unless storms or construction

    Source · NREL

Stations & ports

1 station · 2 ports
RI OER EAST MATUNUCK · L2 J1772 6.5 kW
ChargePoint Network
AC L2 · 6.5 kW

6.5 kW adds roughly 25 miles of range per hour for a typical EV.

Start session on ChargePoint Network network →
1AJ1772· 6.5 kW
1BJ1772· 6.5 kW

Estimated charging time

Level 2 (AC) · 6.5 kW
~8 h 58 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

950 Succotash Rd · South Kingstown, RI · 02879

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is RI OER EAST MATUNUCK located?
RI OER EAST MATUNUCK is located at 950 Succotash Rd, South Kingstown, RI.
What kind of charging does RI OER EAST MATUNUCK offer?
RI OER EAST MATUNUCK offers Level 2 (AC) charging, with stations rated up to 6.5 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at RI OER EAST MATUNUCK?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 58 min on 6.5 kW Level 2 (AC) charging at RI OER EAST MATUNUCK. Actual times vary with vehicle, temperature, and station load.
What are RI OER EAST MATUNUCK's charging hours?
24 hours daily
What charging network operates RI OER EAST MATUNUCK?
RI OER EAST MATUNUCK is part of the ChargePoint network. See more ChargePoint charging across RI on SpotCharge.
Can anyone use the chargers at RI OER EAST MATUNUCK?
Yes — RI OER EAST MATUNUCK is a publicly accessible charging location.
Is the RI OER EAST MATUNUCK listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Rhode Island · 2024
Plug-in vehicles
14K
#42 in US
Battery-electric
8.3K
58% of fleet
EVs per public port
12.6
1,138 ports listed

As of 2024, Rhode Island had 14,300 plug-in vehicles registered — 8,300 fully battery-electric (58%) and 6,000 plug-in hybrid (42%). That ranks Rhode Island #42 nationally and represents about 0.2% of all US plug-in registrations.

Across 1,138 publicly-listed ports in Rhode Island (646 Level 2 and 491 DC fast), that works out to roughly 12.6 EVs per public port and 16.9 BEVs per DC fast port.

Rhode Island has comparatively strong public charging coverage today. Listing here keeps your stations visible as more Rhode Island drivers switch to electric.

Source: AFDC (data from Experian Information Solutions) · See full Rhode Island market data →

More charging in South Kingstown

See all →

GM - Paul Masse Buick GMC South

South Kingstown, RI

DC FastEV Connect
1 station · 2 ports50 kW

Paul Masse Chevrolet South

South Kingstown, RI

DC FastLevel 2
2 stations · 5 ports50 kW

South Kingstown Town Hall

South Kingstown, RI

Level 2
1 station · 2 ports

COMFORT STATION SK MAIN ST LOT1

South Kingstown, RI

Level 2ChargePoint
1 station · 2 ports6.5 kW
Details
Hours
24 hours daily
Phone
888-758-4389
Network
ChargePoint ↗
Access
Public access

Verified by NREL · 3 days ago

Data from NREL

Source data

Every field returned by the public data sources for this location, including empty values. For developers, AI agents, and curious drivers.

NREL Alternative Fuels Data Center76 fields▾

From U.S. DOE AFDC · Public domain

id52598
zip02879
citySouth Kingstown
plus4—
stateRI
ng_psi—
cng_psi—
countryUS
latitude41.377501
bd_blends—
longitude-71.524469
open_date2013-07-15
rd_blends—
ev_networkChargePoint Network
ev_pricing—
unverifiedNo
updated_at2026-11-03T01:06:57Z
access_codepublic
cng_has_rng—
lng_has_rng—
lpg_primary—
status_codeE
bd_blends_fr—
hy_is_retail—
hy_pressures—
hy_standards—
rd_blends_fr—
station_nameRI OER EAST MATUNUCK
ev_other_evse—
ev_pricing_fr—
expected_date—
facility_type—
nps_unit_name—
station_phone888-758-4389
cards_accepted—
ev_dc_fast_num—
ev_network_ids
{
  "posts": [
    "23731131",
    "23731141"
  ],
  "station": [
    "USCPIL125437"
  ]
}
ev_network_webhttps://www.chargepoint.com
fuel_type_codeELEC
geocode_statusGPS
hy_status_link—
street_address950 Succotash Rd
funding_sources—
owner_type_code—
access_days_time24 hours daily
e85_blender_pump—
lpg_nozzle_types—
ng_vehicle_class—
related_stations—
cng_dispenser_num—
cng_total_storage—
cng_vehicle_class—
ev_charging_units
[
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  },
  {
    "network": "ChargePoint Network",
    "connectors": {
      "J1772": {
        "power_kw": 6.5,
        "port_count": 1
      },
      "J3271": {
        "power_kw": null,
        "port_count": 0
      },
      "TESLA": {
        "power_kw": null,
        "port_count": 0
      },
      "CHADEMO": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA515": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA520": {
        "power_kw": null,
        "port_count": 0
      },
      "NEMA1450": {
        "power_kw": null,
        "port_count": 0
      },
      "J1772COMBO": {
        "power_kw": null,
        "port_count": 0
      }
    },
    "port_count": 1,
    "charging_level": "2",
    "funding_sources": []
  }
]
lng_vehicle_class—
ng_fill_type_code—
restricted_accessNo
access_detail_code—
cng_fill_type_code—
ev_connector_typesJ1772
ev_level1_evse_num—
ev_level2_evse_num2
access_days_time_fr—
date_last_confirmed2026-11-03
ev_renewable_source—
cng_renewable_source—
lng_renewable_source—
cng_total_compression—
ev_workplace_chargingNo
maximum_vehicle_class—
rd_max_biodiesel_level—
groups_with_access_codePublic
intersection_directionsMemorial Day–Labor Day, 8AM–6PM: parking fee for chargers. After 6PM: no fee; vehicles must exit by sunset. Rest of year: no parking fee, gates open unless storms or construction
e85_other_ethanol_blends—
rd_blended_with_biodiesel—
groups_with_access_code_frPublic
intersection_directions_fr—
SpotCharge · Owner-listed EV charging