SpotCharge
LocationsEV Tools
Log In
SpotCharge
AboutSupportPricingBlogDestinationsPrivacyTerms
© 2026 SpotCharge
SpotCharge
LocationsEV Tools
Log In
All stationsRhode IslandProvidence
RI-181316

100 WESTMINSTER STATION #3

50 Kennedy Plaza Parking Garage, Providence, RI, 02903
Own this location? This page was built from public charging data. Claim it free to add photos, set hours and pricing, and respond to drivers.Claim this location
no photos uploaded
🌐Imported from open data
Max power
7.2 kW
AC Level 2
Ports
2
ports
Hours
24/7
Open 24 hours
Pricing
—

Stations & ports

1 station · 2 ports
100 WESTMINSTER STATION #3 · L2 J1772
ChargePoint Network
AC L2 · 7.2 kW
Start session on ChargePoint Network network →
1AJ1772· 7.2 kW· 240V/30A
1BJ1772· 7.2 kW· 240V/30A

Estimated charging time

Level 2 (AC) · 7.2 kW
~8 h 6 min

For a typical EV (75 kWh battery) charging from 10% to 80%. Real-world times vary with vehicle, temperature, and station load. Estimate for your EV →

50 Kennedy Plaza Parking Garage · Providence, RI · 02903

Driver check-ins

No driver check-ins yet. Charged here recently? A one-tap report helps the next driver know what to expect.

Charged here? Tell the next driver how it went:

Reviews

No reviews yet — be the first to charge here and share your experience.

Write a review

Frequently asked questions

Where is 100 WESTMINSTER STATION #3 located?
100 WESTMINSTER STATION #3 is located at 50 Kennedy Plaza Parking Garage, Providence, RI.
What kind of charging does 100 WESTMINSTER STATION #3 offer?
100 WESTMINSTER STATION #3 offers Level 2 (AC) charging, with stations rated up to 7.2 kW. There is 1 charging station and 2 total ports at this location.
How long does it take to charge an EV at 100 WESTMINSTER STATION #3?
A typical EV with a 75 kWh battery charging from 10% to 80% takes about 8 h 6 min on 7.2 kW Level 2 (AC) charging at 100 WESTMINSTER STATION #3. Actual times vary with vehicle, temperature, and station load.
What are 100 WESTMINSTER STATION #3's charging hours?
Open 24 hours
What charging network operates 100 WESTMINSTER STATION #3?
100 WESTMINSTER STATION #3 is part of the ChargePoint Network network. See more ChargePoint Network charging across RI on SpotCharge.
Can anyone use the chargers at 100 WESTMINSTER STATION #3?
Yes — 100 WESTMINSTER STATION #3 is a publicly accessible charging location.
Is the 100 WESTMINSTER STATION #3 listing owner-managed?
Not yet. This page was generated from open charging data (NREL) and is refreshed by SpotCharge's weekly sync. If you own or operate this location, you can claim the listing for free and manage it directly.

Area electrification status

Rhode Island · 2024
Plug-in vehicles
14K
#42 in US
Battery-electric
8.3K
58% of fleet
EVs per public port
20.7
692 ports listed

As of 2024, Rhode Island had 14,300 plug-in vehicles registered — 8,300 fully battery-electric (58%) and 6,000 plug-in hybrid (42%). That ranks Rhode Island #42 nationally and represents about 0.2% of all US plug-in registrations.

Across 692 publicly-listed ports in Rhode Island (472 Level 2 and 219 DC fast), that works out to roughly 20.7 EVs per public port and 37.9 BEVs per DC fast port.

Rhode Island's public charging is keeping pace with adoption — but registrations keep climbing. Listing your stations here helps drivers discover charging close to where they already shop, dine, and stay.

Source: AFDC (data from Experian Information Solutions) · See full Rhode Island market data →

More charging in Providence

See all →

Save The Bay

Providence, RI

Level 2Blink Network
1 station · 4 ports7.2 kW

Center Place Providence

Providence, RI

Level 2RED_E
1 station · 6 ports7.2 kW

GC GATEWAY

Providence, RI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW

RI OER PVD AG ST2

Providence, RI

Level 2ChargePoint Network
1 station · 2 ports7.2 kW
Details
Hours
Open 24 hours
Phone
888-758-4389
Network
ChargePoint Network ↗
Access
Public access

Last updated · 2 days ago · OpenChargeMap

Data from NREL

SpotCharge · Owner-listed EV charging